1 |
2010-2011 |
Street Lights at Angadi Bazar Road Chevella Village, |
Chevella |
Chevella |
4/23/2014 |
500000 |
500000 |
0 |
500000 |
Completed |
2 |
2010-2011 |
Construction of C.C Road From Koneru to MPUP School in Gonasapudi (V) |
Chinaganjam |
Gonasapudi |
4/16/2011 |
500000 |
500000 |
0 |
500000 |
Completed |
3 |
2010-2011 |
Gravelling of internal roads at Karumanchi(V) |
Tangutur |
Karumanchi |
4/25/2011 |
200000 |
200000 |
0 |
200000 |
Completed |
4 |
2010-2011 |
Constructionof Community pail at Harijanwada, Karumanchi (V) |
Tangutur |
Karumanchi (V) |
4/25/2011 |
75000 |
75000 |
0 |
75000 |
Completed |
5 |
2010-2011 |
Construction of Common Hall at Shalivahana area in Khila Ghanpur(V & M) |
Ghanpur |
Ghanpur |
4/25/2011 |
200000 |
200000 |
0 |
200000 |
Completed |
6 |
2010-2011 |
Construction of Compound Wall for Common Place at besta area in |
Ghanpur |
Ghanpur |
4/25/2011 |
150000 |
150000 |
0 |
150000 |
Completed |
7 |
2010-2011 |
Construction of Compound Wall for Common Place at Kuruva area in |
Ghanpur |
Ghanpur |
4/25/2011 |
150000 |
150000 |
0 |
150000 |
Completed |
8 |
2010-2011 |
Construction of Common Hall at Chilakatonpally (V) |
Pedda Mandadi |
Chilakatonpally |
4/25/2011 |
200000 |
200000 |
0 |
200000 |
Completed |
9 |
2010-2011 |
Construction of Common Hall at Veddeva area in Veeraipally(V) |
Pedda Mandadi |
Veeraipally |
4/25/2011 |
200000 |
200000 |
0 |
200000 |
Completed |
10 |
2010-2011 |
Construction of Common Hall at Fishermen locality at Edutla (V) |
Gopalpet |
Edutla |
4/25/2011 |
200000 |
200000 |
0 |
200000 |
Completed |
11 |
2010-2011 |
Construction of Common Hall at Fishermen locality at Thatipamla(V) |
Pebbair |
Thatipamla |
4/25/2011 |
200000 |
200000 |
0 |
200000 |
Completed |
12 |
2010-2011 |
Construction of Common Hall at Yadava area in Chandapur(V) |
Wanaparthy |
Chandapur |
4/25/2011 |
60000 |
60000 |
0 |
60000 |
Completed |
13 |
2010-2011 |
Construction of Common Hall at Valmiki area in Chandapur(V) |
Wanaparthy |
Chandapur |
4/25/2011 |
60000 |
60000 |
0 |
60000 |
Completed |
14 |
2010-2011 |
Construction of Youth Building at Srinivaspur(V) |
Wanaparthy |
Srinivaspur(V) |
4/25/2011 |
80000 |
80000 |
0 |
80000 |
Completed |
15 |
2010-2011 |
Construction of Common Hall at Valmiki area in Panchikalapad(V) |
Pebbair |
Panchikalapad(V) |
4/25/2011 |
200000 |
200000 |
0 |
200000 |
Completed |
16 |
2010-2011 |
Construction of Common Hall at Shalivahana(Kummari) area in Veltoor(V) |
Pedda Mandad |
Veltoor |
4/25/2011 |
200000 |
200000 |
0 |
200000 |
Completed |
17 |
2010-2011 |
15 Bore Wells at Sadasivpet Municipality, |
Sadasivpet |
Sadasivpet |
4/30/2011 |
900000 |
900000 |
0 |
900000 |
Completed |
18 |
2010-2011 |
Renewal of BT Road On Road from NH-9 (Mumbai – Hyderabad) Cross Road to Bilkal (V) Via-Aroor, |
Sadasivpet(M) |
Bilkal (V) |
4/30/2011 |
950000 |
950000 |
0 |
950000 |
Completed |
19 |
2010-2011 |
CC Road From Tiginipalli Somayya (H) to Tiguru Subba Rao(H) in Peddevam(V) |
Tallapudi (M) |
Peddevam(V) |
5/2/2011 |
200000 |
200000 |
0 |
198846 |
Completed |
20 |
2010-2011 |
SC Community Hall at Pochavaram (V) |
Tallapudi (M) |
Pochavaram (V) |
5/2/2011 |
350000 |
350000 |
0 |
342418 |
Completed |
21 |
2010-2011 |
C C Road From G Prasad(H) to K.Yanadi (H) in Juvvalapalem (V) |
Kolluru (M) |
Juvvalapalem (V) |
5/7/2011 |
300000 |
300000 |
0 |
300000 |
Completed |
22 |
2010-2011 |
C C Road From G.George (H) to G.Srinivas(H) at Kottagudem of Juvvalapalem (V) |
Kolluru (M) |
Juvvalapalem (V) |
5/7/2011 |
300000 |
300000 |
0 |
300000 |
Completed |
23 |
2010-2011 |
C C Road From G.Israyel (H) to G.Yesobu(H) in Juvvalapalem (V) |
Kolluru (M) |
Juvvalapalem (V) |
5/7/2011 |
300000 |
300000 |
0 |
300000 |
Completed |
24 |
2010-2011 |
C C Road Internal Roads in Guntur Gudem of Juvvalapalem (V) |
Kolluru (M) |
Juvvalapalem (V) |
5/7/2011 |
300000 |
300000 |
0 |
300000 |
Completed |
25 |
2010-2011 |
Construction of Common Hall at Pittuvaripalem(V) |
P.V.Palem |
Pittuvaripalem |
5/31/2011 |
500000 |
500000 |
0 |
500000 |
Completed |
26 |
2010-2011 |
Construction of CC Road at Bommasamudram Harijanawada, Bommasamudam Panchayati |
Irala |
Bommasamudam |
6/5/2011 |
200000 |
200000 |
0 |
200000 |
Completed |
27 |
2010-2011 |
Construction of CC Road at Maddipattlepalli Village |
Irala |
Maddipattlepalli |
6/5/2011 |
150000 |
150000 |
0 |
150000 |
Completed |
28 |
2010-2011 |
Construction of CC Road at Tellagundlapalli Village, |
Irala |
Bhimnenipalli |
6/5/2011 |
150000 |
150000 |
0 |
150000 |
Completed |
29 |
2010-2011 |
Construction of CC Road at Iruvarampalli Village |
Irala |
Iruvarampalli |
6/5/2011 |
100000 |
100000 |
0 |
100000 |
Completed |
30 |
2010-2011 |
construction of RCC Culvert Across Swarnamukhi River,@ M.Kothapalle |
Chandragiri (M) |
M.Kothapalle |
6/26/2011 |
1000000 |
1000000 |
0 |
1000000 |
Completed |
31 |
2010-2011 |
Construction of CC Road from Bheemvaram Road to PHC Centre of Naravaripalle |
Chandragiri (M) |
Kandulavaripalle |
6/26/2011 |
500000 |
500000 |
0 |
500000 |
Completed |
32 |
2010-2011 |
Construction of Community Hall at Gudivanka, |
Gudupalli |
Chinnagollapalli |
7/10/2011 |
500000 |
500000 |
0 |
500000 |
Completed |
33 |
2010-2011 |
Construction of Community Hall at Venkatapuram |
Ramakuppam |
Konganpalli |
7/10/2011 |
200000 |
200000 |
0 |
200000 |
Completed |
34 |
2010-2011 |
Construction of Community Hall at Cheelepalli Village |
Kuppam |
Cheelepalli |
7/10/2011 |
200000 |
200000 |
0 |
200000 |
Completed |
35 |
2010-2011 |
Construction of Community Hall at Gedimakulapalli Village |
Ramakuppam |
Singasamuram |
7/10/2011 |
200000 |
200000 |
0 |
200000 |
Completed |
36 |
2010-2011 |
Construction of Community Hall at Sivakuruburu Village |
Santhipuram |
Sivakuruburu |
7/10/2011 |
200000 |
200000 |
0 |
200000 |
Completed |
37 |
2010-2011 |
Providing of Drinking water Pipeline, Motor Systen at Santhuru Village |
Santhipuram |
Mattam |
7/10/2011 |
150000 |
150000 |
0 |
150000 |
Completed |
38 |
2010-2011 |
Construction of Public Toilets , Near Shadimahal at Rallabuduguru Village |
Santhipuram |
Rallabuduguru |
7/10/2011 |
100000 |
100000 |
0 |
100000 |
Completed |
39 |
2010-2011 |
Construction of CC Roadn B.C. Colony of Eruvapalem Village |
Rajupalem |
Eruvapalem |
8/4/2011 |
500000 |
500000 |
0 |
500000 |
Completed |
40 |
2010-2011 |
Construction of CC RoadFrom Ongole- Nandyala Road to Chinamanagundam Village, (Reach-I) |
Konakanamitla |
Chinamanagundam |
8/30/2011 |
400000 |
400000 |
0 |
400000 |
Completed |
41 |
2010-2011 |
Construction of Community Hall Near Sree Someswaraswamy Temple, Old Pet, Kuppam, |
Kuppam |
Kuppam |
9/1/2011 |
500000 |
500000 |
0 |
500000 |
Completed |
42 |
2010-2011 |
Laying of CC road from Penuganchiprolu Cause-way in 5th ward to Devarasetty Pullaraos house in Penuganchiprolu(V)&(M) |
PENUGANCHIPROLU |
PENUGANCHIPROLU |
11/8/2015 |
500000 |
500000 |
0 |
478413 |
Completed |
43 |
2010-2011 |
Laying of CC road from Kumma Gopalaraos house to Battula Rama Raos house in 5th ward at Penuganchiprolu(V) and (M) |
PENUGANCHIPROLU |
PENUGANCHIPROLU |
11/8/2015 |
500000 |
500000 |
0 |
473453 |
Completed |
44 |
2010-2011 |
Laying of CC road from Kakani Basavamma house to Yalamaddi pullaiah house 14th ward of Penuganchiprolu(V) of (M) |
PENUGANCHIPROLU |
PENUGANCHIPROLU |
11/8/2015 |
500000 |
500000 |
0 |
478413 |
Completed |
45 |
2010-2011 |
Laying of CC road from Sundari Ramaiah house to Polamapalli Kristappa house in 14th ward of Penuganchiprolu(V)&(M) |
PENUGANCHIPROLU |
PENUGANCHIPROLU |
11/8/2015 |
500000 |
500000 |
0 |
473979 |
Completed |
46 |
2010-2011 |
Laying of CC road from Chilukuri saidulu house to Pentala Bargava house in 14th ward of Penuganchiprolu(V)&(M) |
PENUGANCHIPROLU |
PENUGANCHIPROLU |
11/8/2015 |
500000 |
500000 |
0 |
481333 |
Completed |
47 |
2010-2011 |
Laying of CC road from Kurmala Mohnarao house to Penugonda Parivardhana house in 3rd and 4th ward in Penuganchiprolu(V)&(M) |
PENUGANCHIPROLU |
PENUGANCHIPROLU |
11/8/2015 |
500000 |
500000 |
0 |
477034 |
Completed |
48 |
2010-2011 |
Laying of CC road from surampalli Narasaiah Chowitry to Katta Ramulu house in 1st ward Penuganchiprolu(V)&(M) |
PENUGANCHIPROLU |
PENUGANCHIPROLU |
11/8/2015 |
500000 |
500000 |
0 |
478432 |
Completed |
49 |
2010-2011 |
Construction of Community hall adjacent to church(SC) Champadu(V) Venama(M) Guntur Dist |
Guntur |
Vemuru |
5/13/2016 |
1000000 |
1000000 |
0 |
1000000 |
Completed |
50 |
2010-2011 |
Installation of CC TV System(SC) in Ponnavaram(V) Veerullapadu(M) |
VEERULLAPADU |
PONNAVARAM |
9/1/2016 |
799110 |
799110 |
0 |
799110 |
Completed |
51 |
2010-2011 |
One E-Waste management truck to Ponnavaram(V) Veerulapadu(M) |
VEERULLAPADU |
PONNAVARAM |
10/13/2016 |
175920 |
175920 |
0 |
0 |
Not Started |
52 |
2010-2011 |
One E-Waste management truck to Ponnavaram(V)Veerullapadu(M) |
VEERULLAPADU |
PONNAVARAM |
10/13/2016 |
175920 |
175920 |
0 |
0 |
Not Started |
53 |
2010-2011 |
Laying of CC road (ST) B.Satyanarayana house to Subbanna house of Gorantla(M) Ananthapur District |
Anantapur |
Gorantla |
10/31/2016 |
500000 |
250000 |
250000 |
250000 |
Completed |
54 |
2010-2011 |
Laying of CC road ST area subbanna house to Sannappa house at Bathalapalli(V) of Gorantla (M) Anantapur District |
Anantapur |
Gorantla |
10/31/2016 |
500000 |
250000 |
250000 |
250000 |
Completed |
55 |
2010-2011 |
Laying of CC road in ST area M.Narasimhappa house to main road at Bathalapalli (V) of Gorantla (M) Anantapur District |
Anantapur |
Gorantla |
10/31/2016 |
500000 |
250000 |
250000 |
250000 |
Completed |
56 |
2010-2011 |
Procurement of one E-Waste management truck to palaparru(V) of Pedanandipadu(M) Guntur District |
Guntur |
PALAPARRU |
11/7/2016 |
175920 |
175920 |
0 |
0 |
Not Started |
57 |
2010-2011 |
Providing internal CC road china Cheruvu cement road to Makineni Ravindra Babu (H) in A.B.Palem (V) of Pedanandipadu(M) |
Guntur |
Pedanandipadu |
6/9/2018 |
800000 |
400000 |
400000 |
400000 |
Completed |
58 |
2010-2011 |
Providing internal CC road from Makineni Samabasiva Rao (H) to Madlamanchi Goverdhanarao (H) in A.B.Palem(V) of Pedanandipadu(M) |
Guntur |
Pedanandipadu |
6/9/2018 |
300000 |
150000 |
150000 |
150000 |
Completed |
59 |
2011-2012 |
Construction of C.C.Road At Gudimellapadu Village of Mukthinuthalapadu, G.P., |
Ongole |
Mukthinuthalapadu |
11/16/2011 |
500000 |
500000 |
0 |
500000 |
Completed |
60 |
2011-2012 |
Construction of C.C.Road From NTR Statue to Ramulavari Temple in Muppalla Village, |
N.G.Padu |
Muppalla |
11/16/2011 |
500000 |
500000 |
0 |
500000 |
Completed |
61 |
2011-2012 |
Construction of C.C.Road From SC Colony to SC Burial Ground in Santharauru Village |
Chinaganjam |
Santharauru |
11/16/2011 |
500000 |
500000 |
0 |
500000 |
Completed |
62 |
2011-2012 |
Construction of C.C.Road In front of B.C Area and G.P Office Building in Bodawada Village, |
Parchur |
Bodawada |
11/16/2011 |
500000 |
500000 |
0 |
500000 |
Completed |
63 |
2011-2012 |
Construction of C.C.Road From R & B Road to SC Colony of Madigapalle in Sankavarapadu Village, |
Addanki |
Sankavarapadu |
11/16/2011 |
500000 |
500000 |
0 |
500000 |
Completed |
64 |
2011-2012 |
Construction of C.C.Road From Avula Anjaneyulu House to SC Colony of Malapalle in Sankavarapadu Village, |
Addanki |
Sankavarapadu |
11/16/2011 |
500000 |
500000 |
0 |
500000 |
Completed |
65 |
2011-2012 |
Completion of incomplete Community Hall in Harijanawada of Kunkalamaru Village |
Karamchedu |
Kunkalamaru |
11/16/2011 |
500000 |
500000 |
0 |
500000 |
Completed |
66 |
2011-2012 |
Community Hall Near Ramalayam in Bodawada Mandagunta Village, |
Parchur |
Mandagunta |
11/16/2011 |
500000 |
500000 |
0 |
500000 |
Completed |
67 |
2011-2012 |
Construction of RoadFrom Nampalle to I K Reddipalle, |
Irala |
I K Reddipalle |
11/24/2011 |
500000 |
500000 |
0 |
500000 |
Completed |
68 |
2011-2012 |
Construction Community Hall Near Mudiraj Basti, Boyapalli (V) |
Mahaboobnagar |
Boyapalli |
11/24/2011 |
500000 |
500000 |
0 |
500000 |
Completed |
69 |
2011-2012 |
Construction Community Hall In kolluru Village, |
kolluru |
kolluru |
12/7/2011 |
500000 |
500000 |
0 |
500000 |
Completed |
70 |
2011-2012 |
Laying of C.C.Bed High School, Lakkaram, Utnoor (M), Adilabad District |
Utnoor |
Lakkaram |
2/3/2012 |
500000 |
500000 |
0 |
500000 |
Completed |
71 |
2011-2012 |
Laying of C.C.Bed High School, Shampur, Utnoor (M), Adilabad District |
Utnoor |
Shampur |
2/3/2012 |
500000 |
500000 |
0 |
500000 |
Completed |
72 |
2011-2012 |
Laying of C.C.Bed High School, Indravelly, Indravelly (M), Adilabad District |
Utnoor |
Indravelly |
2/3/2012 |
500000 |
500000 |
0 |
500000 |
Completed |
73 |
2011-2012 |
Laying of C.C.Bed Fullaji Baba School, Utnoor (M), Adilabad District. Bit-I. |
Utnoor |
Utnoor |
2/3/2012 |
1000000 |
1000000 |
0 |
1000000 |
Completed |
74 |
2011-2012 |
Laying of C.C.Bed Fullaji Baba School, Utnoor (M), Adilabad District. Bit-II. |
Utnoor |
Utnoor |
2/3/2012 |
1000000 |
1000000 |
0 |
1000000 |
Completed |
75 |
2011-2012 |
Laying of C.C.Bed High School, Tadihatnoor, Nanoor (M), Adilabad District |
Nanoor |
Tadihatnoor |
2/3/2012 |
500000 |
500000 |
0 |
500000 |
Completed |
76 |
2011-2012 |
Laying of C.C.Bed Sisu Mandir School, Utnoor (M), Adilabad District |
Utnoor |
Utnoor |
2/3/2012 |
500000 |
500000 |
0 |
500000 |
Completed |
77 |
2011-2012 |
Laying of C.C.Bed High School, Indanpally, Jannaram (M), Adilabad District |
Jannaram |
Indanpally |
2/3/2012 |
500000 |
500000 |
0 |
500000 |
Completed |
78 |
2011-2012 |
Construction of one class room (MPC), Sri.Gouri Sankar Jr.College (Aided), Proddatur, YSR Kadapa District |
Proddatur |
Proddatur |
2/6/2012 |
490000 |
490000 |
0 |
490000 |
Completed |
79 |
2011-2012 |
Construction of one class room (CEC), Sri.Gouri Sankar Jr.College (Aided), |
Proddatur |
Proddatur |
2/6/2012 |
490000 |
490000 |
0 |
490000 |
Completed |
80 |
2011-2012 |
Laying of C.C.Roads Darga to Thimmamgari Laxmi House near Nethaji Nagar of Kovvur, Padugupadu Village, Sri Potti Sriramulu Nellore District. |
Padugupadu |
Padugupadu |
2/13/2012 |
500000 |
500000 |
0 |
500000 |
Completed |
81 |
2011-2012 |
Construction of Bridge Across Uppodu Kalva at K.M.1.500 Near Kothavangallu (V), H.W.in Kodavalur (M), Sri Potti Sriramulu Nellore District. |
Kodavalur |
Kothavangallu |
2/13/2012 |
500000 |
500000 |
0 |
500000 |
Completed |
82 |
2011-2012 |
Laying of C.C.Road From R&B Road to Dudi Appanna (H) in Sompuram, Vepada Mandal, Vizianagaram District. |
Vepada |
Sompuram |
2/24/2012 |
100000 |
100000 |
0 |
99485 |
Completed |
83 |
2011-2012 |
Laying of internal C.C.Road In Vavilapadu, Vepada Mandal, Vizianagaram District. |
Vepada |
Vavilapadu |
2/24/2012 |
200000 |
200000 |
0 |
195584 |
Completed |
84 |
2011-2012 |
Laying of internal C.C.Road In Seethampeta, Vepada Mandal, Vizianagaram District. |
Vepada |
Seethampeta |
2/24/2012 |
100000 |
100000 |
0 |
99802 |
Completed |
85 |
2011-2012 |
Laying of C.C.Road In Vallampudi (V), Vepada Mandal, Vizianagaram District. |
Vepada |
Vallampudi |
2/24/2012 |
100000 |
100000 |
0 |
97230 |
Completed |
86 |
2011-2012 |
Construction of C.C. Ratainers Wall At B.C.colony in K.G.Pudi, Vepada Mandal, Vizianagaram District. |
Vepada |
K.G.Pudi |
2/24/2012 |
100000 |
100000 |
0 |
97505 |
Completed |
87 |
2011-2012 |
Construction of Community Hall At Paturu (V), Vepada Mandal, Vizianagaram District. |
Vepada |
Paturu |
2/24/2012 |
200000 |
200000 |
0 |
199786 |
Completed |
88 |
2011-2012 |
Laying of C.C.Road At Brahmana Veedi in Nallbilli (V), Vepada Mandal, Vizianagaram District. |
Vepada |
Nallbilli |
2/24/2012 |
100000 |
100000 |
0 |
99407 |
Completed |
89 |
2011-2012 |
Laying of the Road From V.B.Peta to Laxmipuram, L Kota Mandal, Vizianagaram District. |
L Kota |
Laxmipuram |
2/24/2012 |
200000 |
200000 |
0 |
199079 |
Completed |
90 |
2011-2012 |
Metalling of Internal Roads Kapugallu Village of Kodad Mandal, Bit No.1, Nalgonda District |
Kodad |
Kapugallu |
2/29/2012 |
200000 |
200000 |
0 |
200000 |
Completed |
91 |
2011-2012 |
Metalling of Internal Roads Kapugallu Village of Kodad Mandal, Bit No.2, Nalgonda District |
Kodad |
Kapugallu |
2/29/2012 |
200000 |
200000 |
0 |
200000 |
Completed |
92 |
2011-2012 |
Metalling of Internal Roads Kapugallu Village of Kodad Mandal, Bit No.3, Nalgonda District |
Kodad |
Kapugallu |
2/29/2012 |
200000 |
200000 |
0 |
200000 |
Completed |
93 |
2011-2012 |
Laying of C.C.Road At Veerlagudipalle Village & H.W. of Thavanampalle Mandal, Chittoor District. |
Thavanampalle |
Veerlagudipalle |
2/29/2012 |
500000 |
500000 |
0 |
500000 |
Completed |
94 |
2011-2012 |
At Venkataramanapeta (V) of S.Kota (M), Vizianagaram District. |
S.Kota |
Venkataramanapeta |
3/6/2012 |
48000 |
48000 |
0 |
36077 |
Completed |
95 |
2011-2012 |
Drilling of Bore well Near Vechalapu Kallalu in S.Kota (V&M), Vizianagaram District. |
S.Kota |
Vechalapu Kallalu |
3/6/2012 |
48000 |
48000 |
0 |
38322 |
Completed |
96 |
2011-2012 |
Drilling of Bore well Near Singampalli Kallam (V) of S.Kota (M), Vizianagaram District. |
S.Kota |
Singampalli Kallam |
3/6/2012 |
48000 |
48000 |
0 |
34880 |
Completed |
97 |
2011-2012 |
Drilling of Bore well Near Singampalli Kallam in Krishnapuram (V) of S.Kota (M), Vizianagaram District. |
S.Kota |
Singampalli Kallam |
3/6/2012 |
48000 |
48000 |
0 |
43364 |
Completed |
98 |
2011-2012 |
Drilling of Bore well Near Bobbili Tatababu Kallam in Alugubilli (V) of S.Kota (M), Vizianagaram District. |
S.Kota |
Alugubilli |
3/6/2012 |
48000 |
48000 |
0 |
42678 |
Completed |
99 |
2011-2012 |
Drilling of Bore well Near Ambedkar Bhavan in Dharmavaram (V) of S.Kota (M), Vizianagaram District. |
S.Kota |
Dharmavaram |
3/6/2012 |
48000 |
48000 |
0 |
32726 |
Completed |
100 |
2011-2012 |
Drilling of Bore well Near Allu Apparao Kallalu in Dharmavaram (V) of S.Kota (M), Vizianagaram District. |
S.Kota |
Dharmavaram |
3/6/2012 |
48000 |
48000 |
0 |
32508 |
Completed |
101 |
2011-2012 |
Drilling of Bore well Near Lagudu Apparao house in Dharmavaram (V) of S.Kota (M), Vizianagaram District. |
S.Kota |
Dharmavaram |
3/6/2012 |
48000 |
48000 |
0 |
32825 |
Completed |
102 |
2011-2012 |
Drilling of Bore well At Ganivada Ramakrishna house in Devada of Kothavalasa (M), Vizianagaram District. |
Kothavalasa |
Devada |
3/6/2012 |
48000 |
48000 |
0 |
39771 |
Completed |
103 |
2011-2012 |
Drilling of Bore well At Diddi Tatababu Kallalu near Ravalammagudi in KMV Palem of Kothavalasa (M), Vizianagaram District. |
Kothavalasa |
KMV Palem |
3/6/2012 |
48000 |
48000 |
0 |
43454 |
Completed |
104 |
2011-2012 |
Drilling of Bore well At Omkar Ashramam in Thummikapalli Village of Kothavalasa (M), Vizianagaram District. |
Kothavalasa |
Thummikapalli |
3/6/2012 |
48000 |
48000 |
0 |
41105 |
Completed |
105 |
2011-2012 |
Drilling of Bore well At Kandavari Kallalu in Ramalingapuram Village of Kothavalasa (M), Vizianagaram District. |
Kothavalasa |
Ramalingapuram |
3/6/2012 |
48000 |
48000 |
0 |
44397 |
Completed |
106 |
2011-2012 |
Drilling of Bore well At Chappavari Veedhi in Mulagapakavanipalem Village of Kothavalasa (M), Vizianagaram District. |
Kothavalasa |
Mulagapakavanipalem |
3/6/2012 |
48000 |
48000 |
0 |
47262 |
Completed |
107 |
2011-2012 |
Drilling of Bore well At Middivari Kallalu in M.Ramachandrapuram (V) of Kothavalasa (M), Vizianagaram District. |
Kothavalasa |
M.Ramachandrapuram |
3/6/2012 |
48000 |
48000 |
0 |
45923 |
Completed |
108 |
2011-2012 |
Drilling of Bore well At Vechalapu vari Kallalu in Cheepuruvasala (V) of Kothavalasa (M), Vizianagaram District. |
Kothavalasa |
Cheepuruvasala |
3/6/2012 |
48000 |
48000 |
0 |
46799 |
Completed |
109 |
2011-2012 |
Drilling of Bore well At Santapalem Village of Kothavalasa (M), Vizianagaram District. |
Kothavalasa |
Santapalem |
3/6/2012 |
48000 |
48000 |
0 |
40551 |
Completed |
110 |
2011-2012 |
Drilling of Bore well At Nimmalapalem Village of Kothavalasa (M), Vizianagaram District. |
Kothavalasa |
Nimmalapalem |
3/6/2012 |
48000 |
48000 |
0 |
43367 |
Completed |
111 |
2011-2012 |
Drilling of Bore well At KalayanaMandapam in Chintalapalem of Kothavalasa (M), Vizianagaram District. |
Kothavalasa |
Chintalapalem |
3/6/2012 |
48000 |
48000 |
0 |
40422 |
Completed |
112 |
2011-2012 |
Drilling of Bore well Near DW scheme at Alamanda Village, Jammi (M), Vizianagaram District. |
Jammi |
Alamanda |
3/6/2012 |
48000 |
48000 |
0 |
46953 |
Completed |
113 |
2011-2012 |
Drilling of Bore well At Patikallalu in Thanavaram Village, Jammi (M), Vizianagaram District. |
Jammi |
Thanavaram |
3/6/2012 |
48000 |
48000 |
0 |
39067 |
Completed |
114 |
2011-2012 |
Drilling of Bore well At Mugada Demudu house in Narayanapuram Village, Jammi (M), Vizianagaram District. |
Jammi |
Narayanapuram |
3/6/2012 |
48000 |
48000 |
0 |
41883 |
Completed |
115 |
2011-2012 |
Drilling of Bore well At Chappavari Kallalu in Kalagada (V), Jammi (M), Vizianagaram District. |
Jammi |
Kalagada |
3/6/2012 |
48000 |
48000 |
0 |
39351 |
Completed |
116 |
2011-2012 |
Completion of incomplete Community Hall at Govada, Amratulur Mandal, Guntur District. |
Amratulur |
Govada |
3/12/2012 |
500000 |
500000 |
0 |
500000 |
Completed |
117 |
2011-2012 |
Construction of Road From Chitvel Garugupalli Road to P krishnaiah Naidu land, Chitvel Mandal, |
Chitvel |
Chitvel |
3/14/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
118 |
2011-2012 |
Construction of Road From Ananthampalli Lakshmipuram to Kasturi Narsaiah Land, Penagalur Mandal |
Penagalur |
Penagalur |
3/14/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
119 |
2011-2012 |
Construction of Road From Govindampalli, Chitvel Road to Pollineni Venkata Subbaiah land, Penagalur Mandal |
Penagalur |
Penagalur |
3/14/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
120 |
2011-2012 |
Construction of Road From Kakarlavaripalli to Botumeedapalli Arundathiwada, |
Obulavaripalli |
Obulavaripalli |
3/14/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
121 |
2011-2012 |
Construction of Road From Gowri Siddeswara Temple to Gobburuvaripalli Panchayat, |
Obulavaripalli |
Gobburuvaripalli |
3/14/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
122 |
2011-2012 |
Provision of Protection to Aluguvanka At P Ramaiah lands near Govindampalli Village, |
Penagalur |
Govindampalli |
3/14/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
123 |
2011-2012 |
Constructon of Community Hall Kasapeta Village, L.Kota Mandal, Vizianagaram Dist. |
L.Kota |
Kasapeta |
4/7/2012 |
490000 |
490000 |
0 |
488450 |
Completed |
124 |
2011-2012 |
Construction of C.C.Road In Bangarigiri Street, Khasapeta Village, L.Kota Mandal, Vizianagaram Dist. |
L.Kota |
Kasapeta |
4/7/2012 |
200000 |
200000 |
0 |
199058 |
Completed |
125 |
2011-2012 |
Construction of C.C.Road B.C.Colony in Garvivada (V), L.Kota Mandal, Vizianagaram Dist. |
L.Kota |
Garvivada |
4/7/2012 |
150000 |
150000 |
0 |
149059 |
Completed |
126 |
2011-2012 |
Construction of C.C.Road From Kagutata House to Community Hall in Gansubadi (V), L.Kota Mandal, Vizianagaram Dist. |
L.Kota |
Gansubadi |
4/7/2012 |
150000 |
150000 |
0 |
149507 |
Completed |
127 |
2011-2012 |
Construction of C.C.Road From Main Street to S.C.Colony in Latchampeta (V) L.Kota Mandal, Vizianagaram Dist. |
L.Kota |
Latchampeta |
4/7/2012 |
100000 |
100000 |
0 |
99209 |
Completed |
128 |
2011-2012 |
Construction of C.C.Road In Bhoomireddy palem (V), L.Kota Mandal, Vizianagaram Dist. |
L.Kota |
Bhoomireddy palem |
4/7/2012 |
100000 |
100000 |
0 |
99329 |
Completed |
129 |
2011-2012 |
Construction of Culvert In Veerabadrapeta (V) , L.Kota Mandal, Vizianagaram Dist. |
L.Kota |
Veerabadrapeta |
4/7/2012 |
150000 |
150000 |
0 |
150000 |
Completed |
130 |
2011-2012 |
Construction of C.C.Road In Nandasampeta (V), L.Kota Mandal, Vizianagaram Dist. |
L.Kota |
Nandasampeta |
4/7/2012 |
100000 |
100000 |
0 |
96088 |
Completed |
131 |
2011-2012 |
Construction of C.C.Road In B.C.Colony in Ranbgarayapurem (V) L.Kota Mandal, Vizianagaram Dist. |
L.Kota |
Ranbgarayapurem |
4/7/2012 |
150000 |
150000 |
0 |
148555 |
Completed |
132 |
2011-2012 |
Construction of C.C.Road In Dasari Street in Kurmavaram (V), L.Kota Mandal, Vizianagaram Dist. |
L.Kota |
Kurmavaram |
4/7/2012 |
150000 |
150000 |
0 |
149024 |
Completed |
133 |
2011-2012 |
Constructon of Community Hall At Veerabhadrapuram Village, Kothavalasa Mandal, Vizianagaram Dist. |
Kothavalasa |
Veerabhadrapuram |
4/7/2012 |
490000 |
490000 |
0 |
483002 |
Completed |
134 |
2011-2012 |
Laying of Internal Roads In Govada (V) of Amarthluru Mandal, Guntur District. |
Amarthluru |
Govada |
4/23/2012 |
225000 |
225000 |
0 |
225000 |
Completed |
135 |
2011-2012 |
Construction of Community Hall In Dasaripalem H/O Gorigapudi (V) of Bhattiprolu Mandal, Guntur District. |
Bhattiprolu |
Gorigapudi |
4/23/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
136 |
2011-2012 |
Completion of incomplete Community Hall In S.C.Colony of Kollur Village & Mandal, Guntur District. |
Kollur |
Kollur |
4/23/2012 |
350000 |
350000 |
0 |
350000 |
Completed |
137 |
2011-2012 |
Erection of Domestic Electrical Line At Ravilanka Village of Kollur Mandal, Guntur District. |
Kollur |
Ravilanka |
4/23/2012 |
285000 |
285000 |
0 |
285000 |
Completed |
138 |
2011-2012 |
Construction of Community Hall In S.C.Colony, Kishkindapalem (V)of Kollur Mandal, Guntur District. |
Kollur |
Kishkindapalem |
4/23/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
139 |
2011-2012 |
Construction of Community Hall In Rolugunta Panchayat (V&M) Visakhapatnam Dist. |
Rolugunta |
Rolugunta |
8/23/2012 |
500000 |
500000 |
0 |
500000 |
Completed |
140 |
2011-2012 |
Construction of Community Stage In V.Sarabavaram Village & Panchayat, Rolugunta Mandal, Visakhapatnam Dist. |
Rolugunta |
V.Sarabavaram |
8/23/2012 |
125000 |
125000 |
0 |
125000 |
Completed |
141 |
2011-2012 |
Completion of Incomplete Community Hall At Seethayyapeta Village, Chintapaka Panchayath, Butchiyyapeta Mandal, Visakhapatnam Dist. |
Butchiyyapeta |
Seethayyapeta |
8/23/2012 |
120000 |
120000 |
0 |
120000 |
Completed |
142 |
2011-2012 |
Construction of Community Stage In Polepalli Village & Panchayat, Butchiyyapeta Mandal, Visakhapatnam Dist. |
Butchiyyapeta |
Polepalli |
8/23/2012 |
150000 |
150000 |
0 |
150000 |
Completed |
143 |
2011-2012 |
Completion of Incomplete Community Hall Near by Rama Temple at Dondapudi Village & Panchayath, Ravikamatham Mandal, Visakhapatnam Dist. |
Ravikamatham |
Dondapudi |
8/23/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
144 |
2011-2012 |
Completion of Incomplete Community hall Nearby Rama Temple at Chinapachila Village & Panchayath, Ravikamatham Mandal, Visakhapatnam Dist. |
Ravikamatham |
Chinapachila |
8/23/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
145 |
2011-2012 |
Construction of Community Hall Near Rama Temple in Komira Village & Panchayath, Ravikamatham Mandal, Visakhapatnam Dist. |
Ravikamatham |
Komira |
8/23/2012 |
150000 |
150000 |
0 |
150000 |
Completed |
146 |
2011-2012 |
Construction of Community Hall Near Mutyalamma Temple at Gummalapadu Village & Panchayath, Ravikamatham Mandal, Visakhapatnam Dist. |
Ravikamatham |
Gummalapadu |
8/23/2012 |
150000 |
150000 |
0 |
150000 |
Completed |
147 |
2011-2012 |
Completion of Incomplete Community Hall In Kotaveedhi in Chodavaram Panchayath, Village & Mandal, Visakhapatnam Dist. |
Chodavaram |
Chodavaram |
8/23/2012 |
250000 |
250000 |
0 |
250000 |
Completed |
148 |
2011-2012 |
Completion of Incomplete Community Hall In Velamaveedhi in Chodavaram Panchayath, Village & Mandal, Visakhapatnam Dist. |
Chodavaram |
Chodavaram |
8/23/2012 |
500000 |
500000 |
0 |
500000 |
Completed |
149 |
2011-2012 |
Completion of Incomplete Community Hall In Devangula Veedhi in Chodavaram Panchayath, Village & Mandal, Visakhapatnam Dist. |
Chodavaram |
Chodavaram |
8/23/2012 |
250000 |
250000 |
0 |
250000 |
Completed |
150 |
2011-2012 |
Completion of Incomplete Community Hall In Rammohanpeta in Chodavaram Panchayath, Village & Mandal, Visakhapatnam Dist. |
Chodavaram |
Chodavaram |
8/23/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
151 |
2011-2012 |
Completion of Incomplete Community Hall In Relliveedhi in Rammohanpeta in Chodavaram Panchayath, Village & Mandal, Visakhapatnam Dist. |
Chodavaram |
Chodavaram |
8/23/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
152 |
2011-2012 |
Completion of Incomplete Community Hall At China Bazar near Gandhi Statue in Chodavaram Panchayath, Village & Mandal, Visakhapatnam Dist. |
Chodavaram |
Chodavaram |
8/23/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
153 |
2011-2012 |
Completion of Incomplete Community Hall At Yathapeta in Chodavaram Panchayath, Village & Mandal, Visakhapatnam Dist. |
Chodavaram |
Chodavaram |
8/23/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
154 |
2011-2012 |
Completion of Incomplete Community Hall At Nayibrahmin Street, Chandaka Veedhi in Chodavaram Panchayath, Village & Mandal, Visakhapatnam Dist. |
Chodavaram |
Chodavaram |
8/23/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
155 |
2011-2012 |
Completion of Incomplete Community Hall Near Poorna Theatre in Chodavaram Panchayath, Village & Mandal, Visakhapatnam Dist. |
Chodavaram |
Chodavaram |
8/23/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
156 |
2011-2012 |
Construction of Community Hall In Lakshmidevipeta in Chodavaram Panchayath, Village & Mandal, Visakhapatnam Dist. |
Chodavaram |
Chodavaram |
8/23/2012 |
250000 |
250000 |
0 |
250000 |
Completed |
157 |
2011-2012 |
Completion of Incomplete Vision Centre At Chodavaram Village & Panchayah, Chodavaram Mandal, Visakhapatnam Dist. |
Chodavaram |
Chodavaram |
8/23/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
158 |
2011-2012 |
Completion of Incomplete Community Hall In SC Locality in PS Peta in Chodavaram Panchayath, Village & Mandal, Visakhapatnam Dist. |
Chodavaram |
Chodavaram |
8/23/2012 |
200000 |
200000 |
0 |
200000 |
Completed |
159 |
2011-2012 |
Construction of Kalyana Mantapam Modamamba Kalyana Mantpam at Vommali (V) Madugula Mandal, Visakhapatnam Dist. |
Madugula |
Vommali |
8/23/2012 |
150000 |
150000 |
0 |
150000 |
Completed |
160 |
2011-2012 |
Construction of Compound Wall At M.P.Elementary School, M.Koduru, Madugula Mandal, Visakhapatnam Dist. |
Madugula |
M.Koduru |
8/23/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
161 |
2011-2012 |
Construction of Community Stage At Thiruvada (V), Hamlet of Avuruvada Panchayat of Madugula Mandal, Visakhapatnam Dist. |
Madugula |
Thiruvada |
8/23/2012 |
150000 |
150000 |
0 |
150000 |
Completed |
162 |
2011-2012 |
Construction of C.C.Road In Diguva Veedhi, Jalampalli (V), V.Madugula Mandal, Visakhapatnam Dist. |
Madugula |
Jalampalli |
8/23/2012 |
115000 |
115000 |
0 |
115000 |
Completed |
163 |
2011-2012 |
Construction of Compound Wall At Gowri Sankar Temple, Veeranarayanam (V) V.Madugula Mandal, Visakhapatnam Dist. |
Madugula |
Veeranarayanam |
8/23/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
164 |
2011-2012 |
Construction of Compound Wall At Sri Veerabhrahmendra Swamy’s Temple, Cheedikada (V) Cheedikada Mandal, Visakhapatnam Dist. |
Cheedikada |
Cheedikada |
8/23/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
165 |
2011-2012 |
Completion of Incomplete Community Stage K.L.B.Patnam, Hamlet of L.B.Patnam, Cheedikada Mandal, Visakhapatnam Dist. |
Cheedikada |
L.B.Patnam |
8/23/2012 |
75000 |
75000 |
0 |
75000 |
Completed |
166 |
2011-2012 |
Construction of C.C.Road From Rongali Thatamnaidu House to Singampalli Naidu House, L.B.Patnam(V). Cheedikada Mandal, Visakhapatnam Dist. |
Cheedikada |
L.B.Patnam |
8/23/2012 |
150000 |
150000 |
0 |
150000 |
Completed |
167 |
2011-2012 |
Construction of Protection Wall To Sivalayam, B.Singavaram (V) Cheedikada Mandal, Visakhapatnam Dist. |
Cheedikada |
B.Singavaram |
8/23/2012 |
200000 |
200000 |
0 |
200000 |
Completed |
168 |
2011-2012 |
Construction of C.C.Road From S.C.Colony to B.Singavaram B.T.Road , Appalarajupuram (V) Cheedikada Mandal, Visakhapatnam Dist. |
Cheedikada |
B.Singavaram |
8/23/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
169 |
2011-2012 |
Construction of C.C.Drains Konam (V) Cheedikada Mandal, Visakhapatnam Dist. |
Cheedikada |
Konam |
8/23/2012 |
150000 |
150000 |
0 |
150000 |
Completed |
170 |
2011-2012 |
Construction of C.C.Road In Gandhamvari Veedhi, K.M.Palem (V) Devarapalle Mandal, Visakhapatnam Dist. |
Devarapalle |
K.M.Palem |
8/23/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
171 |
2011-2012 |
Construction of C.C.Road From Centre of the Village to Pasalamma Temple, V.Santhapalem (V), K.Kotapadu Mandal, Visakhapatnam Dist. |
K.Kotapadu |
V.Santhapalem |
8/23/2012 |
150000 |
150000 |
0 |
150000 |
Completed |
172 |
2011-2012 |
Construction of C.C.Drain Pothanavalasa (V), K.Kotapadu Mandal, Visakhapatnam Dist. |
K.Kotapadu |
Pothanavalasa |
8/23/2012 |
60000 |
60000 |
0 |
60000 |
Completed |
173 |
2011-2012 |
Construction of Internal C.C.Roads Gondupalem (V), K.Kotapadu Mandal, Visakhapatnam Dist. |
K.Kotapadu |
Gondupalem |
8/23/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
174 |
2011-2012 |
Construction of Community Stage Gullipalli (V), K.Kotapadu Mandal, Visakhapatnam Dist. |
K.Kotapadu |
Gullipalli |
8/23/2012 |
150000 |
150000 |
0 |
150000 |
Completed |
175 |
2011-2012 |
Construction of Internal C.C.Roads Lankavanipalem (V), K.Kotapadu Mandal, Visakhapatnam Dist. |
K.Kotapadu |
Lankavanipalem |
8/23/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
176 |
2011-2012 |
Drinking Water Bore Well Near Velugula Krishna’s House, Jalampalli (V) Madugula Mandal, Visakhapatnam Dist. |
Madugula |
Jalampalli |
3/30/2013 |
50000 |
50000 |
0 |
50000 |
Completed |
177 |
2011-2012 |
Drinking Water Bore Well China Kothapalli (V) Hamlet of Jalampalli, Madugula Mandal, Visakhapatnam Dist. |
Madugula |
Jalampalli |
3/30/2013 |
50000 |
50000 |
0 |
50000 |
Completed |
178 |
2011-2012 |
Drinking Water Bore Well Near Vechalapu Akku Naidu’s in Lankavanipalem (V) of K.Kotapadu Mandal, Visakhapatnam Dist. |
K.Kotapadu |
Lankavanipalem |
3/30/2013 |
50000 |
50000 |
0 |
50000 |
Completed |
179 |
2011-2012 |
Drinking Water Bore Well Near Kannuru Appala Naidu’s House Kollivanipalem, Hamlet of Raiwada, Raiwada (V) Devarapalle Mandal, Visakhapatnam dist. |
Devarapalle |
Raiwada |
5/16/2013 |
50000 |
50000 |
0 |
50000 |
Completed |
180 |
2011-2012 |
Drinking Water Bore Well Near Varadi mahalakshmi’s House in Raiwada (V) Devarapalle Mandal, Visakhapatnam Dist |
Devarapalle |
Raiwada |
5/16/2013 |
50000 |
50000 |
0 |
50000 |
Completed |
181 |
2011-2012 |
DRILLING OF BORE WELL NEAR GOLLAVANI BANDA |
Visakhapatnam |
L KOTA |
3/6/2012 |
48000 |
48000 |
0 |
45277 |
Completed |
182 |
2011-2012 |
Construction of community hall in Arudahit Colony of Pedamuttaevi (V) Movva (M) |
MOVVA |
PEDAMUTTEVI |
5/27/2011 |
500000 |
500000 |
0 |
490785 |
Completed |
183 |
2011-2012 |
Constrution of RCC Culvert from Kanchikachekra to S.Amaravaram across paddula wagu Kanchikachelra (V) and (M) |
KANCHIKACHERLA |
KANCHIKACHERLA |
8/7/2011 |
1000000 |
1000000 |
0 |
984500 |
Completed |
184 |
2011-2012 |
Construction of BT road from Gandhi statue center of Ponnavaram (V) Veerullapadu (M) |
VEERULLAPADU |
PONNAVARAM |
8/7/2011 |
2500000 |
2500000 |
0 |
2053849 |
Completed |
185 |
2011-2012 |
Construction of road from R&B road to Madunuru polimera Donka in Kalavapamula (V) Vuyyuru (M) |
VUYYURU |
KALAVAPAMULA |
8/7/2011 |
500000 |
500000 |
0 |
493646 |
Completed |
186 |
2011-2012 |
Construction of CC road in MPUP school Bazaar in Subbaigudem (V) Penuganchiprolu (M) |
PENUGANCHIPROLU |
SUBBAYAGUDEM |
12/3/2011 |
500000 |
500000 |
0 |
498079 |
Completed |
187 |
2011-2012 |
Construction of CC road from R&B road to Elementary School in Penjendra (V) Gudlavalleru (M) |
GUDLAVALLERU |
PENJENDRA |
8/7/2011 |
380000 |
380000 |
0 |
377107 |
Completed |
188 |
2011-2012 |
Formation of road from madicherla to Chillaboinpalli villages in Madicherla(V) Bapulapadu (M) |
BAPULAPADU |
MADICHERLA |
11/20/2011 |
500000 |
500000 |
0 |
496978 |
Completed |
189 |
2011-2012 |
Gravelling of internal roads in SC locality of Gudem Madhavaram (V) Veerullapadu (M) |
VEERULLAPADU |
GUDEM MADHAVARAM |
8/8/2013 |
350000 |
350000 |
0 |
314630 |
Completed |
190 |
2011-2012 |
Gravelling of internal rods in BC locality of Gudem Madhavram (V) Veerullapadu (M) |
VEERULLAPADU |
GUDEM MADHAVARAM |
8/28/2011 |
450000 |
450000 |
0 |
359009 |
Completed |
191 |
2011-2012 |
Construction of CC road from R&B road to veterinary Hospital in Penjendra (V) Gudlavalleru (M) |
GUDLAVALLERU |
PENJENDRA |
1/13/2012 |
500000 |
500000 |
0 |
497773 |
Completed |
192 |
2011-2012 |
Construction of CC road from K.Pullaiah house to G.Ratnamma house in Chowtapalli (V) Veerullapadu (M) |
VEERULLAPADU |
CHAVATAPALLE |
1/13/2012 |
300000 |
300000 |
0 |
296919 |
Completed |
193 |
2011-2012 |
Gravelling of internal roads Jujjuru (V) Veerullapadu (M) |
VEERULLAPADU |
JUJJURU |
1/13/2012 |
300000 |
300000 |
0 |
293875 |
Completed |
194 |
2011-2012 |
Construction of CC road from G.Madavaram Gangineni R&B road to Thimmapuram (V) of Veerulapadu (M) |
VEERULLAPADU |
THIMMAPURAM |
1/13/2012 |
300000 |
300000 |
0 |
290166 |
Completed |
195 |
2011-2012 |
Laying of internal roads SC colony Jammavaram (V) of Veerullapadu (M) |
VEERULLAPADU |
JAMMAVARAM |
1/13/2012 |
300000 |
300000 |
0 |
293168 |
Completed |
196 |
2011-2012 |
Gravelling of internal roads Doddadevarapadu (V) Veerullapdu (M) |
VEERULLAPADU |
DODDA DEVARAPADU |
1/13/2012 |
300000 |
300000 |
0 |
298250 |
Completed |
197 |
2011-2012 |
Construction of CC road from main road to Seelam Sitaramai Reddy house NarasimharaoPalem (V) of Veerullapadu (M) |
VEERULLAPADU |
NARASIMHARAOPALEM |
1/13/2012 |
300000 |
300000 |
0 |
296023 |
Completed |
198 |
2011-2012 |
Gravelling of internal roads Chowtapalli (V) of Veerullapadu (M) |
VEERULLAPADU |
CHAVATAPALLE |
1/13/2012 |
200000 |
200000 |
0 |
199957 |
Completed |
199 |
2011-2012 |
Gravelling of road from Chowtapalli R&B road to Doddadevarapadu R&B road Doddadevarapadu (V) Veerullapadu (M) |
VEERULLAPADU |
DODDA DEVARAPADU |
1/13/2012 |
200000 |
200000 |
0 |
199237 |
Completed |
200 |
2011-2012 |
Revetment of Drinking Water Tank in Narasimhapuram(V) of Koduru (M) |
KODURU |
KODURU |
2/16/2012 |
650000 |
650000 |
0 |
620165 |
Completed |
201 |
2011-2012 |
Gravelling of road from Chowtapalli Veerullapadu R&B Road to Jayanthi road of Veerullapdu (M) |
VEERULLAPADU |
JAYANTHI |
5/5/2012 |
400000 |
400000 |
0 |
397749 |
Completed |
202 |
2011-2012 |
Laying of CC road from Bhimavaram ZP road to Azmeeru Satyanarayana house in ST area of Makkapet(V) of Vasavai(M) |
VATSAVAI |
MAKKAPETA |
8/31/2015 |
500000 |
500000 |
0 |
496958 |
Completed |
203 |
2011-2012 |
Laying of CC road from Ajmeeru Satyanarayana house to Ajmeeru suraiah house in ST area of Makkapet(V) of Vatsavai(M) |
VATSAVAI |
MAKKAPETA |
8/31/2015 |
500000 |
500000 |
0 |
496262 |
Completed |
204 |
2011-2012 |
Providing of CC road from Ajmeeru Suraiah house to Daravath Konda house in ST area of Makkapeta(V) of Vatsavai(M) |
VATSAVAI |
MAKKAPETA |
8/31/2015 |
500000 |
500000 |
0 |
496261 |
Completed |
205 |
2011-2012 |
Providing of CC road from Daravath Konda house to Model Colony Cross road in ST area of Makkapeta(V) of Vatsavai(M) |
VATSAVAI |
MAKKAPETA |
8/31/2015 |
500000 |
500000 |
0 |
486471 |
Completed |
206 |
2011-2012 |
Providing of CC road from Model colony road to Penuganchiprolu R&B road in ST area of Makkapeta(V) of Vatsavai(M) |
VATSAVAI |
MAKKAPETA |
8/31/2015 |
500000 |
500000 |
0 |
442435 |
Completed |
207 |
2011-2012 |
Providing CC road and drains from R&B road to Omkarapu NageswaraRao in West Chodavaram(V) Nallajerla(M) West Godavari Dist |
West Godavari |
Chodavaram |
1/17/2014 |
395000 |
395000 |
0 |
360783 |
Completed |
208 |
2011-2012 |
Construction of CC road at peddagollapalli(V) of Irala (M) in Chittoor District. |
Chittoor |
Irala |
9/26/2015 |
250000 |
250000 |
0 |
250000 |
Completed |
209 |
2011-2012 |
Construction of CC road at Pandiguttoor(V) of Mudigolam GP Irala(M) Chittoor District. |
Chittoor |
Mudigolam |
9/26/2015 |
250000 |
250000 |
0 |
250000 |
Completed |
210 |
2011-2012 |
Construction of CC road Palamthopu(P) Paluru GP Chittoor District |
Chittoor |
Paluru |
9/26/2015 |
250000 |
250000 |
0 |
250000 |
Completed |
211 |
2011-2012 |
Construction of CC road Pathapalyam to Thoti H/W Pathapalem GP Chittoor District |
Chittoor |
Pathapalem |
9/26/2015 |
250000 |
250000 |
0 |
250000 |
Completed |
212 |
2011-2012 |
Construction of CC road at new Sivagiri ST Colony alos know as Yanadi Colony in Pitchatur (M) Chittoor District |
Chittoor |
Yanadi Colony |
9/26/2015 |
500000 |
500000 |
0 |
500000 |
Completed |
213 |
2011-2012 |
Construction of CC road to internal streets at new sivagiri AAW in Pitchatur (M) Chittoor Dist |
Chittoor |
Pitchatur |
9/26/2015 |
500000 |
500000 |
0 |
500000 |
Completed |
214 |
2011-2012 |
Providing CC road from Kakarla Sambaiah house to Medarmetla Ramakotaiah house in Agnigundala(V) of Ipur(M) Guntur Dist |
Guntur |
Agnigundala |
9/26/2015 |
300000 |
300000 |
0 |
300000 |
Completed |
215 |
2011-2012 |
Formation of Gravelling from Ravulapuram R&B road to Domalagudem Road Ravulapuram(V) Bollapalli(M) Gunturu Dist |
Guntur |
Ravulapuram |
9/26/2015 |
400000 |
400000 |
0 |
400000 |
Completed |
216 |
2011-2012 |
Formaion and Gravelling to the road from Chakrrapalem to Balusukunta in Chakrayapalem(V) Bollapadu(M) Guntur Dist |
Guntur |
Chkrayapalem |
9/26/2015 |
200000 |
200000 |
0 |
200000 |
Completed |
217 |
2011-2012 |
Formation of Gravel road from Kothakunta to Vemula Road Mupparajuvaripalem (V) Nuzendala (M) Guntur Dist |
Guntur |
Mupparajuvaripalem |
9/26/2015 |
300000 |
300000 |
0 |
300000 |
Completed |
218 |
2011-2012 |
Construction of CC road from R&B road to Mallelli Pedavenkateswara Rao house in Lingapalem (V) of Vemsoor (M) Kammam Dist |
Khammam |
Vamsoor |
10/7/2015 |
500000 |
500000 |
0 |
500000 |
Completed |
219 |
2011-2012 |
Laying of Balance CC road in Kommanetur new SC colony in Kommanetur GP Gudur Mandal in Nellore District |
Nellore |
Kommanetur |
5/29/2014 |
500000 |
500000 |
0 |
499480 |
Completed |
220 |
2011-2012 |
One E-Waste Management truck to Lingala(V) Vastavai(M) |
VATSAVAI |
LINGALA |
10/13/2016 |
175920 |
175920 |
0 |
0 |
Not Started |
221 |
2011-2012 |
Providing CC road from Rajubangarupalem BT road to K.Chandrasekara Rao in ST locality of Chinjanjam(V) Ongole Dist |
Ongole |
Chinjanjam |
9/12/2017 |
500000 |
250000 |
250000 |
250000 |
Completed |
222 |
2011-2012 |
Providing internal CC road in ST area of Sopirala in Chinaganjam (V) Ongole Dist |
Ongole |
Chinaganjam |
9/12/2017 |
500000 |
250000 |
250000 |
250000 |
Completed |
223 |
2012-2013 |
Borewell Near Terlapalli Arjun House, S.C.Colony, Petamalapalli Village, Golugonda Mandal, Visakhapatnam Dist. |
Golugonda |
Petamalapalli |
3/30/2012 |
50000 |
50000 |
0 |
50000 |
Completed |
224 |
2012-2013 |
Construction of Community Hall In Y.B.Agraharam Village, Nathavaram Mandal, Visakhapatnam Dist. |
Nathavaram |
Y.B.Agraharam |
3/30/2012 |
150000 |
150000 |
0 |
150000 |
Completed |
225 |
2012-2013 |
Borewell In Place of Dry Borewell to Mineral Water Plant at Gangi Reddy Palli Village, V.N.Palli Mandal, Kadapa District. |
V.N.Palli |
Gangi Reddy Palli |
5/7/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
226 |
2012-2013 |
Borewell In Place of Dry Borewell to Mineral Water Plant at Pathasengati Palli Village, Pendlimarry Mandal, Kadapa District. |
Pendlimarry |
Pathasengati Palli |
5/7/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
227 |
2012-2013 |
Laying of C.C.Road From Bapatla-Pedanandipadu R&B Road to SK.Mabasha House in Kakumanu (V&M), Guntur Dist. |
Kakumanu |
Kakumanu |
6/30/2012 |
220000 |
220000 |
0 |
220000 |
Completed |
228 |
2012-2013 |
Laying of C.C.Road From Bapatla-Pedanandipadu R&B Road to SK.Khajavali House in Kakumanu (V&M), Guntur Dist. |
Kakumanu |
Kakumanu |
6/30/2012 |
250000 |
250000 |
0 |
250000 |
Completed |
229 |
2012-2013 |
Laying of Internal Roads In B.C.Colony of Kakumanu (V&M), Guntur Dist. |
Kakumanu |
Kakumanu |
6/30/2012 |
500000 |
500000 |
0 |
500000 |
Completed |
230 |
2012-2013 |
Laying of C.C.Road From Kakumanu-Ponnur R&B Road to GDCC Bank in Kakumanu (V&M), Guntur Dist. |
Kakumanu |
Kakumanu |
6/30/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
231 |
2012-2013 |
Laying of C.C.Road In Vanjiwaka Village of Kota Mandal, SPSR Nellore District. |
Kota |
Vanjiwaka |
7/25/2012 |
500000 |
500000 |
0 |
500000 |
Completed |
232 |
2012-2013 |
Construction of Community Hall In Sri Rangapuram, Guntur District. |
Sri Rangapuram |
Sri Rangapuram |
7/25/2012 |
200000 |
200000 |
0 |
200000 |
Completed |
233 |
2012-2013 |
Construction of Community Hall In Salapadu SC Colony, Guntur District. |
Salapadu |
Salapadu |
7/25/2012 |
200000 |
200000 |
0 |
200000 |
Completed |
234 |
2012-2013 |
Construction of Community Hall In Nambur Village SC Colony, Guntur District. |
Nambur |
Nambur |
7/25/2012 |
200000 |
200000 |
0 |
200000 |
Completed |
235 |
2012-2013 |
Construction of Community Hall In Ponnur Town-1, Guntur District. |
Ponnur |
Ponnur |
7/25/2012 |
200000 |
200000 |
0 |
200000 |
Completed |
236 |
2012-2013 |
Construction of Bus Shelter In Anamaolapudi Village, Guntur District. |
Anamaolapudi |
Anamaolapudi |
7/25/2012 |
200000 |
200000 |
0 |
200000 |
Completed |
237 |
2012-2013 |
Construction of Community Hall In Nagulapalem in Parchur Mandal, Prakasam District. |
Parchur |
Nagulapalem |
7/27/2012 |
500000 |
500000 |
0 |
500000 |
Completed |
238 |
2012-2013 |
Construction of C.C.Road In Mixed Colony, Kodavaluru Village, Kondavaluru Mandal, Sri Potti SriRamulu Nellore District. |
Kondavaluru |
Kodavaluru |
7/30/2012 |
250000 |
250000 |
0 |
250000 |
Completed |
239 |
2012-2013 |
Construction of C.C.Road In Hrijanawada, Kodavaluru Village, Kondavaluru Mandal, Sri Potti SriRamulu Nellore District. |
Kondavaluru |
Kodavaluru |
7/30/2012 |
250000 |
250000 |
0 |
250000 |
Completed |
240 |
2012-2013 |
Construction of Community Building In Kodavaluru Village, Kondavaluru Mandal, Sri Potti SriRamulu Nellore District. |
Kondavaluru |
Kodavaluru |
7/30/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
241 |
2012-2013 |
Formation & Gravelling of Roads In S.T.Colony of Penubarthi Village of Nellore Rural Mandal, Sri Potti SriRamulu Nellore District. |
Nellore |
Penubarthi |
7/30/2012 |
500000 |
500000 |
0 |
500000 |
Completed |
242 |
2012-2013 |
Laying of C.C.Road From Mohan Reddy (H) to Balaiah (H) at Rayanpet, M.P.Kothakota, Mahabubnagar District. |
M.P.Kothakota |
Rayanpet, |
8/3/2012 |
250000 |
250000 |
0 |
250000 |
Completed |
243 |
2012-2013 |
Laying of C.C.Road From Balaiah (H) to Kurmaiah (H) at Rayanpet, M.P.Kothakota, Mahabubnagar District. |
M.P.Kothakota |
Rayanpet, |
8/3/2012 |
290000 |
290000 |
0 |
290000 |
Completed |
244 |
2012-2013 |
Laying of C.C.Road From Kurmaiah (H) to Nagendram (H) at Rayanpet, M.P.Kothakota, Mahabubnagar District. |
M.P.Kothakota |
Rayanpet, |
8/3/2012 |
325000 |
325000 |
0 |
325000 |
Completed |
245 |
2012-2013 |
Laying of C.C.Road From Nagendram (H) to Shivalayam Temple (H) at Rayanpet, M.P.Kothakota, Mahabubnagar District. |
M.P.Kothakota |
Rayanpet, |
8/3/2012 |
360000 |
360000 |
0 |
360000 |
Completed |
246 |
2012-2013 |
Construction of C.C.Road In Kolla Street Extention, Nagari, Nagari Municipality, Chittoor District. |
Nagari |
Nagari |
8/4/2012 |
90000 |
90000 |
0 |
90000 |
Completed |
247 |
2012-2013 |
Construction of C.C.Road In Perumal gudi street, Ekambarakuppam, Nagari Municipality, Chittoor District. |
Nagari |
Nagari |
8/4/2012 |
90000 |
90000 |
0 |
90000 |
Completed |
248 |
2012-2013 |
Construction of C.C.Road In B.T.M. Street, Pudupet, Nagari Municipality, Chittoor District. |
Nagari |
Nagari |
8/4/2012 |
90000 |
90000 |
0 |
90000 |
Completed |
249 |
2012-2013 |
Construction of C.C.Road In K.V.P.R.Pet, Nagari Municipality, Chittoor District. |
Nagari |
Nagari |
8/4/2012 |
90000 |
90000 |
0 |
90000 |
Completed |
250 |
2012-2013 |
Construction of C.C.Road In N.G.O.Colony, Puttur, Puttur Municipality, Chittoor District. |
Puttur |
Puttur |
8/4/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
251 |
2012-2013 |
Construction of C.C.Road In 5th Ward, Puttur, Puttur Municipality, Chittoor District. |
Puttur |
Puttur |
8/4/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
252 |
2012-2013 |
Construction of C.C.Road In NTR Colony, Puttur, Puttur Municipality, Chittoor District. |
Puttur |
Puttur |
8/4/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
253 |
2012-2013 |
Construction of C.C.Road In Venganna Kandiga, Nagari Mandal, Chittoor District. |
Nagari |
Nagari |
8/4/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
254 |
2012-2013 |
Construction of C.C.Road In Rajula Kandriga of Tirumala Kuppam, Puttur Mandal, Chittoor District. |
Puttur |
Tirumala Kuppam |
8/4/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
255 |
2012-2013 |
Construction of C.C.Road In Athuru in Nindra Mandal, Chittoor District. |
Nindra |
Athuru |
8/4/2012 |
200000 |
200000 |
0 |
200000 |
Completed |
256 |
2012-2013 |
Construction of C.C.Road In Pachikalva, Vadamala pet Mandal, Chittoor District. |
Vadamala pet |
Pachikalva |
8/4/2012 |
200000 |
200000 |
0 |
200000 |
Completed |
257 |
2012-2013 |
Construction of C.C.Road In Ellasamudram AAW in Vijayapuram Mandal, Chittoor District. |
Vijayapuram |
Ellasamudram |
8/4/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
258 |
2012-2013 |
Pipeline Extention In Vijayapuram, Vijayapuram Mandal, Chittoor District. |
Vijayapuram |
Vijayapuram |
8/4/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
259 |
2012-2013 |
Laying of Public Water Supply System In nagulapalem Village of Parchur Mandal, Ongole Division, Prakasam District. |
Parchur |
Nagulapalem |
9/26/2012 |
500000 |
500000 |
0 |
500000 |
Completed |
260 |
2012-2013 |
Construction of Community Hall At Goridindla Village of Atmakur Mandal, Anantapur District. |
Atmakur |
Goridindla |
9/26/2012 |
500000 |
500000 |
0 |
500000 |
Completed |
261 |
2012-2013 |
Construction of Community Hall Near Tirumala Devara Devastanam (West Side) at Gangampalli (V) of Ramagiri Mandal, Anantapur District. |
Anantapur |
Gangampalli |
9/29/2012 |
500000 |
500000 |
0 |
500000 |
Completed |
262 |
2012-2013 |
Construction of Community Hall Near Tirumala Devara Devastanam (East Side) at Gangampalli (V) of Ramagiri Mandal, Anantapur District. |
Anantapur |
Gangampalli |
9/29/2012 |
500000 |
500000 |
0 |
500000 |
Completed |
263 |
2012-2013 |
Construction of Open Borewell with Steining At Khasimdevipeta (V) of Mulugu (M), Warangal District. |
Mulugu |
Khasimdevipeta |
9/30/2012 |
500000 |
500000 |
0 |
500000 |
Completed |
264 |
2012-2013 |
Lyaing of Internal C.C.Roads, At Kolukonda (V), Devaruppula Mandal, Warangal District. |
Devaruppula |
Kolukonda |
9/30/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
265 |
2012-2013 |
Lyaing of Internal C.C.Roads, In SC Area, AT Devaruppula Village & Mandal, Warangal District. |
Devaruppula |
Devaruppula |
9/30/2012 |
500000 |
500000 |
0 |
500000 |
Completed |
266 |
2012-2013 |
Lyaing of Internal C.C.Roads, In SC Area, At Choudur (V), Devaruppula Mandal, Warangal District. |
Devaruppula |
Chodur |
9/30/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
267 |
2012-2013 |
Lyaing of Internal C.C.Roads, In SC Area, At Neermala (V), Devaruppula Mandal, Warangal District. |
Devaruppula |
Neermala |
9/30/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
268 |
2012-2013 |
Lyaing of Internal C.C.Roads, At Seetharampuram (V), Devaruppula Mandal, Warangal District. |
Devaruppula |
Seethaampuram |
9/30/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
269 |
2012-2013 |
Lyaing of Internal C.C.Roads, At Gollapalli (V), Devaruppula Mandal, Warangal District. |
Devaruppula |
Gollapalli |
9/30/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
270 |
2012-2013 |
Lyaing of Internal C.C.Roads, In Sc Area, At Chinnamadur (V), Devaruppula Mandal, Warangal District. |
Devaruppula |
Chinnamadur |
9/30/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
271 |
2012-2013 |
Lyaing of Internal C.C.Roads, In ST Area, At Peddamadur (V), Devaruppula, Warangal District. |
Devaruppula |
Peddamadur |
9/30/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
272 |
2012-2013 |
Lyaing of Internal C.C.Roads, At Ramarajupalli (V), Devaruppula Mandal, Warangal District. |
Devaruppula |
Ramarajupalli |
9/30/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
273 |
2012-2013 |
Lyaing of Internal C.C.Roads, At Singarajupalli (V) Devaruppula Mandal, Warangal District. |
Devaruppula |
Singarajupalli |
9/30/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
274 |
2012-2013 |
Lyaing of Internal C.C.Roads, In SC Area, At Kamareddy gudem (V) Devaruppula(M), Warangal District. |
Devaruppula |
Kamareddy gudem |
9/30/2012 |
400000 |
400000 |
0 |
400000 |
Completed |
275 |
2012-2013 |
Lyaing of Internal C.C.Roads, In SC Area, At Dharmapuram (V) Devaruppula Mandal, Warangal District. |
Devaruppula |
Dharmapuram |
9/30/2012 |
200000 |
200000 |
0 |
200000 |
Completed |
276 |
2012-2013 |
Lyaing of Internal C.C.Roads, In SC Area, At Appireddy (V) Devaruppula Mandal, Warangal District. |
Devaruppula |
Appireddy |
9/30/2012 |
200000 |
200000 |
0 |
200000 |
Completed |
277 |
2012-2013 |
Lyaing of Internal C.C.Roads, In ST Area, At Madhapuram(V) Devaruppula Mandal, Warangal District. |
Devaruppula |
Madhapuram |
9/30/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
278 |
2012-2013 |
Lyaing of Internal C.C.Roads, In SC Area, At manipadu (V) Devaruppula Mandal, Warangal District. |
Devaruppula |
Manipadu |
9/30/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
279 |
2012-2013 |
Completion of Incomplete SC Community Hall In bandaraipakula Village, Gopalet Mandal, Wanaraparthy, Constituency, Mahabubnagar Dist. |
bandaraipakula |
bandaraipakula |
10/21/2012 |
200000 |
200000 |
0 |
200000 |
Completed |
280 |
2012-2013 |
Construction of Community Hall In Sagar Colony at Ayyavaripally Village, Pebbair Mandal, Wanaparthy Constituency, Mahaboobnagar Dist. |
Pebbair |
Ayyavaripally |
10/21/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
281 |
2012-2013 |
Construction of Community HalI Yadav Locality at Ayyavaripally Village, Pebbair Mandal, Wanaparthy Constituency, Mahaboobnagar Dist. |
Pebbair |
Ayyavaripally |
10/21/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
282 |
2012-2013 |
Construction of Community HalI In Sugur Village-Darga Road, Pebbair Mandal, Wanaparthy Constituency, Mahaboobnagar Dist. |
Pebbair |
Sugur |
10/21/2012 |
200000 |
200000 |
0 |
200000 |
Completed |
283 |
2012-2013 |
Construction of Community HalI In Shagapur Villagein Yadav Locality , Pebbair Mandal, WanaparthyConstituency, Mahaboobnagar Dist. |
Pebbair |
Shagapur |
10/21/2012 |
200000 |
200000 |
0 |
200000 |
Completed |
284 |
2012-2013 |
Construction of Community HalI To Common place in seripally Village, Pebbair Mandal, Wanaparthy Constituency, Mahaboobnagar Dist. |
Pebbair |
seripally |
10/21/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
285 |
2012-2013 |
Construction of Community HalI In Md Hussainpally, Khilaghanpur Mandal, Wanaparthy Constituency, Mahaboobnagar Dist. |
Khilaghanpur |
Md Hussainpally |
10/21/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
286 |
2012-2013 |
Laying of CC Road In Garlabanda Thanda, Khilaghanpur Mandal, Wanaparthy Constituency, Mahaboobnagar Dist. |
Khilaghanpur |
Garlabanda Thanda, |
10/21/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
287 |
2012-2013 |
Construction of Community Hall In Yadav locality at Jagathpally Village, Peddamandadi Mandal, Wanaparthy Constituency, Mahaboobnagar Dist. |
Peddamandadi |
Jagathpally |
10/21/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
288 |
2012-2013 |
Completion of Communith Hall 46 Division, |
Rajahmundry |
Venkatapuram, |
10/31/2012 |
700000 |
700000 |
0 |
631973 |
Completed |
289 |
2012-2013 |
Construction of Community Hall 2nd Division, Gopalnagar Puntha Road, |
Rajahmundry |
Near Durgamma Temple, |
10/31/2012 |
300000 |
300000 |
0 |
276757 |
Completed |
290 |
2012-2013 |
Construction of class room at Fullaji Baba School, Class Room-1 |
Utnoor |
Utnoor |
12/11/2012 |
490000 |
490000 |
0 |
490000 |
Completed |
291 |
2012-2013 |
Construction of class room at Fullaji Baba School, Class Room-2 |
Utnoor |
Utnoor |
12/11/2012 |
490000 |
490000 |
0 |
490000 |
Completed |
292 |
2012-2013 |
Construction of Drawing room at Fullaji Baba School, Drawing Room-1 |
Utnoor |
Utnoor |
12/11/2012 |
490000 |
490000 |
0 |
490000 |
Completed |
293 |
2012-2013 |
Construction of Drawing room at Fullaji Baba School, Drawing Room-2 |
Utnoor |
Utnoor |
12/11/2012 |
490000 |
490000 |
0 |
490000 |
Completed |
294 |
2012-2013 |
Construction of Darmentary room at Fullaji Baba School, Utnoor(M), Adilabad district- Darmentary Room-1 |
Utnoor |
Utnoor |
12/11/2012 |
490000 |
490000 |
0 |
490000 |
Completed |
295 |
2012-2013 |
Construction of Darmentary room at Fullaji Baba School, Darmentary Room-2 |
Utnoor |
Utnoor |
12/11/2012 |
490000 |
490000 |
0 |
490000 |
Completed |
296 |
2012-2013 |
Laying of Ground at Fullaji Baba School, |
Utnoor |
Utnoor |
12/11/2012 |
300000 |
300000 |
0 |
300000 |
Completed |
297 |
2012-2013 |
Construction of Community Hall Near Roddam Main, Roddam Mandal, Anantapur District. |
Roddam |
Roddam |
12/12/2012 |
850000 |
850000 |
0 |
850000 |
Completed |
298 |
2012-2013 |
Construction of Community Hall In Annapurna Colony, Vadlapudi Village, Guntur District. |
Vadlapudi |
Vadlapudi |
12/20/2012 |
200000 |
200000 |
0 |
200000 |
Completed |
299 |
2012-2013 |
Completion of CC Road In Marripalem h/o |
Edlapadu |
Unnava(GP) |
12/20/2012 |
200000 |
200000 |
0 |
200000 |
Completed |
300 |
2012-2013 |
Completion of CC Drains From Thella Venkateswarlu Site to Kothuri Purnachandra Rao (H) in Chilakaluripet Constituency, Guntur District. |
Nadendla , |
Ameensahebpalem, |
12/20/2012 |
260000 |
260000 |
0 |
260000 |
Completed |
301 |
2012-2013 |
Laying of Roads In Vaddera (B.C) Colony in Kanaparru Village, Nadendra Mandal, Chilakaluripet Constituency, Guntur District. |
Nadendla , |
Kanaparru |
12/20/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
302 |
2012-2013 |
Construction of CC Road and Drains From Kolla Sambasiva Rao (H) to Evuri Kameswari (H) in Gottipadu, |
Chilakaluripet |
Mittapalem |
12/20/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
303 |
2012-2013 |
Construction of CC Road From Sankaru Bonku to Uppalapati Venkata Rao House in Kammavaripalem, Chilakaluripet Mandal, Guntur District. |
Chilakaluripet |
Kammavarpalem |
12/20/2012 |
200000 |
200000 |
0 |
200000 |
Completed |
304 |
2012-2013 |
Constructon of Incomplete CC Road From Kamineni Lakshmaiah House to Javvadhi Kotaiah House in Govindrapuram, Chilaaluripet Mandal, Guntur District. |
Chilakaluripet |
Govindapuram |
12/20/2012 |
100000 |
100000 |
0 |
100000 |
Completed |
305 |
2012-2013 |
Completion of Incomplete Community Hall At Oppicherla Village in Karempudi Manda, Macherla Constituency, Guntur District. |
Macherla |
Karempudi |
12/20/2012 |
1000000 |
1000000 |
0 |
1000000 |
Completed |
306 |
2012-2013 |
Construction of CC Road Munnea Pitchaiah House to Mannem Brhmaiah & Kanaparthi Malakondaiah House Via Potibandla Chenchaiah House, Veera Raghavuni Kota Village, Lingasamudram Mandalam, Kandukuru Constituency, Prakasam District. |
Lingasamudram |
Veera Raghavuni Kota |
12/25/2012 |
800000 |
800000 |
0 |
800000 |
Completed |
307 |
2012-2013 |
Construction of Slab Culvert At S.T.Colony of Ganigunta Village of Kandukur Manda, Kandukuru Constituency, Ongole, Prakasam District. |
Kandukur |
Ganigunta |
12/25/2012 |
250000 |
250000 |
0 |
250000 |
Completed |
308 |
2012-2013 |
Drilling of Borewell, Erection of Pumpset and Giving Connections to Existing PWS Scheme At Harijanawada In Sameerapalem (V) in V.V.Palem Manda, Kandukuru Constituency, Ongole, Prakasam District. |
V V Palem |
Sameerapalem |
12/25/2012 |
70000 |
70000 |
0 |
70000 |
Completed |
309 |
2012-2013 |
Construction of CC Road From R&B Road to Subrahmanya Swamy Temple at Pallantla Village, Devarapalli Manda, West Godavari District. |
Devarapalle |
Pallantla |
12/29/2012 |
200000 |
200000 |
0 |
195839 |
Completed |
310 |
2012-2013 |
Construction of CC Road From K.Surendra Rice Mill to V.Dharama Rao House at Palantla Village, Devarapalli Mandal, West Godavari District. |
Devarapalle |
Pallantla |
12/29/2012 |
200000 |
200000 |
0 |
197323 |
Completed |
311 |
2012-2013 |
Construction of CC Road From Garapati Sri.Rama Murthy House to K.Venata Narayana House at Pallantla Village, Devarapalli Mandal, West Godavari District. |
Devarapalle |
Pallantla |
12/29/2012 |
200000 |
200000 |
0 |
197323 |
Completed |
312 |
2012-2013 |
Construction of CC Road From S.Ganaga Raju House to G.Pentayya House at Palantla (V) Devarapalli (M) West Godavari District. |
Devarapalle |
Pallantla |
12/29/2012 |
200000 |
200000 |
0 |
197323 |
Completed |
313 |
2012-2013 |
Construction of CC Road From M Rama Rao House to I.Ratnaji Housae in S.C. Are of Pallantla Village, Devarapali Mandal, West Godavari District. |
Devarapalle |
Pallantla |
12/29/2012 |
200000 |
200000 |
0 |
197323 |
Completed |
314 |
2012-2013 |
Construction of CC Road From I.Bhushanam House to I.Gangaraju House in S.C. Area at Pallanta Village, Devarapai Manda, West Godavari District. |
Devarapalle |
Pallantla |
12/29/2012 |
200000 |
200000 |
0 |
197319 |
Completed |
315 |
2012-2013 |
Construction of Common Hall Near Temple |
Addakula |
Ponnakal |
2/6/2013 |
500000 |
500000 |
0 |
500000 |
Completed |
316 |
2012-2013 |
Balance of Common Hall at Near Temple |
Kothakota |
Kanimelate |
2/6/2013 |
200000 |
200000 |
0 |
200000 |
Completed |
317 |
2012-2013 |
Construction of Common Hall Near Temple, at |
Addakula |
Janampeta |
2/6/2013 |
300000 |
300000 |
0 |
300000 |
Completed |
318 |
2012-2013 |
Providing of CC Drain, From Door No.1-2-695 to 1-2-687 in Rajaka Nagar, Anantapur (R) (M), Anantapur District. |
Anantapur |
Rajaka Nagar |
3/1/2013 |
495000 |
495000 |
0 |
495000 |
Completed |
319 |
2012-2013 |
Providing of CC Drain, From Door No.1-2-658 to 1-2-386-2 in Rajaka Nagar, Anantapur (R) (M), Anantapur District. |
Anantapur |
Rajaka Nagar |
3/1/2013 |
495000 |
495000 |
0 |
495000 |
Completed |
320 |
2012-2013 |
Providing CC Drain From Door No.1-2-887 to 1-2-685-2 in Rajaka Nagar, Anantapur (R) (M), Anantapur District. |
Anantapur |
Rajaka Nagar |
3/1/2013 |
495000 |
495000 |
0 |
495000 |
Completed |
321 |
2012-2013 |
Providing of CC Drain, From Door No.1-2-395 to 1-2-316-1 in Rajaka Nagar, Anantapur (R) (M), Anantapur District. |
Anantapur |
Rajaka Nagar |
3/1/2013 |
495000 |
495000 |
0 |
495000 |
Completed |
322 |
2012-2013 |
Providing of CC Drain In 1st Line in Gourava Garden, Anantapur (R) (M), Anantapur District. |
Anantapur |
Gourava Gardn |
3/1/2013 |
495000 |
495000 |
0 |
495000 |
Completed |
323 |
2012-2013 |
Providing CC Road and Drain, In SC at Eruvapalem of Rajupalem (M) Proddatur Constituency, Kadapa Dist., Reach-2 |
Rajupalem |
Eruvapalem |
3/26/2013 |
200000 |
200000 |
0 |
200000 |
Completed |
324 |
2012-2013 |
Providing CC Road and Drain, In SC Colony at Eruvapalem of Rajupalem (M) Kadapa Dist., Reach-3 |
Rajupalem |
Eruvapalem |
3/26/2013 |
200000 |
200000 |
0 |
200000 |
Completed |
325 |
2012-2013 |
Borewell Near Kothuru Samba House, Nagaram Village, Golugonda Mandal, Visakhapatnam Dist. |
Golugonda |
Nagaram |
3/30/2013 |
50000 |
50000 |
0 |
50000 |
Completed |
326 |
2012-2013 |
Borewell Near Vijayak Temple, A.L.Puram Village Golugonda Mandal, Visakhapatnam Dist. |
Golugonda |
A.L.Puram |
3/30/2013 |
50000 |
50000 |
0 |
50000 |
Completed |
327 |
2012-2013 |
Borewell Near Ginjarthi Talupulamma Temple, Ginjarthi, Golugonda Mandal, Visakhapatnam Dist. |
Golugonda |
Ginjarthi, |
3/30/2013 |
50000 |
50000 |
0 |
50000 |
Completed |
328 |
2012-2013 |
Construction of Community Hall In Shrungavaram Village, Nathavaram Mandal, Visakhapatnam Dist. |
Nathavaram |
Shrungavaram |
3/30/2013 |
100000 |
100000 |
0 |
100000 |
Completed |
329 |
2012-2013 |
Construction of Community Hall In Sarugudu Village (S.T.Area), Nathavaram Mandal, Visakhapatnam Dist. |
Nathavaram |
Sarugudu |
3/30/2013 |
100000 |
100000 |
0 |
100000 |
Completed |
330 |
2012-2013 |
Construction of Community Hall In Madhavaram Village (S.T.Area), Nathavaram Mandal, Visakhapatnam Dist. |
Nathavaram |
Madhavaram |
3/30/2013 |
150000 |
150000 |
0 |
150000 |
Completed |
331 |
2012-2013 |
Laying of Cement Road In Cherlopalem Village (S.C.Area), Nathavaram Mandal, Visakhapatnam Dist. |
Nathavaram |
Cherlopalem |
3/30/2013 |
200000 |
200000 |
0 |
200000 |
Completed |
332 |
2012-2013 |
Motor and pipelines for Water In narsipatnam Government High School in Narsipatnam Village, Narsipatnam Mandal, Visakhapatnam Dist. |
Narsipatnam |
Narsipatnam |
3/30/2013 |
100000 |
100000 |
0 |
100000 |
Completed |
333 |
2012-2013 |
Construction of Community Hall, In SC locality Nagpur Village, Gopalpet Mandal, Wanaparthy Constituency, Mahaboobnagar Dist., Reach-1 |
Gopalpet |
Nagpur |
4/12/2013 |
300000 |
300000 |
0 |
300000 |
Completed |
334 |
2012-2013 |
Construction of Compound Wall, To Primary School at Jampla Thanda (ST) Buddaram Village, Gopalpet Mandal, Wanaparthy Constituency, Mahaboobnagar Dist., Reach-2 |
Gopalpet |
Buddaram |
4/12/2013 |
300000 |
300000 |
0 |
300000 |
Completed |
335 |
2012-2013 |
Laying of CC Road At Mandal Head Quarter in SC Locality Gopalpet Village, Gopalpet Mandal, Wanaparthy Constituency, Mahaboobnagar Dist., Reach-3 |
Gopalpet |
Gopalpet |
4/12/2013 |
300000 |
300000 |
0 |
300000 |
Completed |
336 |
2012-2013 |
Construction of Common Hall In KambalapoorThanda (ST) Kambalapoor Village, Pebbair Mandal, Wanaparthy Constituency, Mahaboobnagar District. Reach-5 |
Pebbair |
Kambalapoor |
4/12/2013 |
300000 |
300000 |
0 |
300000 |
Completed |
337 |
2012-2013 |
Construction of Common Hall in Chervumeda Thanda (ST) Savaigudem Village, Wanaparthy Mandal, Wanaparthy Constituency, Mahaboobnagar Dist., Reach-8 |
Wanaparthy |
SaVaigudem |
4/12/2013 |
300000 |
300000 |
0 |
300000 |
Completed |
338 |
2012-2013 |
Lyaing of B.T Road, Government Model Residential Polytechnic College, Madanapalle. Chittoor District. |
Madanapalle |
Polytechnic College |
4/23/2013 |
1000000 |
1000000 |
0 |
1000000 |
Completed |
339 |
2012-2013 |
Providing CC Road and Drain, in SC Colony at Eruvapalem of Rajupalem (M) Proddatur Constituency, kadapa Dist, Reach-1 |
Rajupalem |
Eruvapalem |
4/24/2013 |
200000 |
200000 |
0 |
200000 |
Completed |
340 |
2012-2013 |
Shifting of Heavy Electrical Line in Guvvakallu H.W |
Guvvakallu |
Guvvakallu |
5/8/2013 |
100000 |
100000 |
0 |
100000 |
Completed |
341 |
2012-2013 |
Power Connection to the Bore in Eamgaripalle of Pakala, Chittoor District. |
Pakala |
Eamgaripalle |
5/8/2013 |
50000 |
50000 |
0 |
50000 |
Completed |
342 |
2012-2013 |
CC Road in Gollapalle Mahadevamangalam G.P G.D, Nellore Mandal, Chittoor District. |
Nellore |
Mahadevamangalam |
5/8/2013 |
100000 |
100000 |
0 |
100000 |
Completed |
343 |
2012-2013 |
C.C Road in Thumgundram H W & G.P |
Thumgundam |
Thumgundam |
5/8/2013 |
100000 |
100000 |
0 |
100000 |
Completed |
344 |
2012-2013 |
Bus Shelter in Chappidipalle (V) Baireddypalle Mandal, Chittoor District. |
Baireddypalle |
Chappidipalle |
5/8/2013 |
100000 |
100000 |
0 |
100000 |
Completed |
345 |
2012-2013 |
Bus Shelter at Ramasundram Cross in Kaigal Point, Baireddypalle Mandal, Chittoor District. |
Baireddypalle |
Kaigal |
5/8/2013 |
100000 |
100000 |
0 |
100000 |
Completed |
346 |
2012-2013 |
CC Road Cum Drain, from Bareddypalle Main road to Mahamadeya street, Baireddypalle Mandal, Chittoor District. |
Baireddypalle |
Mahadeya street |
5/8/2013 |
200000 |
200000 |
0 |
200000 |
Completed |
347 |
2012-2013 |
Bus Shelter at Bhathukandriga CTR – PTR Main Road Gangavaram Mandal, Chittoor District. |
Gangavaram |
Gangavaram |
5/8/2013 |
100000 |
100000 |
0 |
100000 |
Completed |
348 |
2012-2013 |
Bus Shelter in Kuruvipalle Cross at Madanapalle Road, Gangavaram Mandal, Chittoor District. |
Gangavaram |
Gangavaram |
5/8/2013 |
100000 |
100000 |
0 |
100000 |
Completed |
349 |
2012-2013 |
Bus Shelter in Kuapalle Corss Bandapalle G.P, Gangavaram Mandal, Chittoor District. |
Gangavaram |
Gangavaram |
5/8/2013 |
100000 |
100000 |
0 |
100000 |
Completed |
350 |
2012-2013 |
C.C Road in Kammapalem, Rayalpeta G.P, Peddepanjani Mandal, Chittoor District. |
peddepanjani |
Rayalpeta GP |
5/8/2013 |
100000 |
100000 |
0 |
100000 |
Completed |
351 |
2012-2013 |
C.C Road in Berapalle, Peddepanjani Mandal, Chittoor District. |
Peddepanjani |
Berapalle |
5/8/2013 |
100000 |
100000 |
0 |
100000 |
Completed |
352 |
2012-2013 |
C.C Road in Duggivaripalle H/o Kolamasanapalle, Plalamaneru Mandal, Chittoor District. |
Plalamaneru |
Kolamasanapalle |
5/8/2013 |
100000 |
100000 |
0 |
100000 |
Completed |
353 |
2012-2013 |
C.C Road in Jellipeta H/o Kurmayi |
Kurmayi |
Jellipeta |
5/8/2013 |
100000 |
100000 |
0 |
100000 |
Completed |
354 |
2012-2013 |
C.C Road in Veerlagudipalle, Vavil Thota G.P Puthapput Mandal, Chittoor District. |
Puthapput |
Vavil Thota GP |
5/8/2013 |
100000 |
100000 |
0 |
100000 |
Completed |
355 |
2012-2013 |
Bus Shelter in (Erramrajupalli G.P) Krishnapuram Cross, Kaivetinagaram Mandal, Chittoor District. |
kaivetinagaram |
Kaivetinagaram |
5/8/2013 |
100000 |
100000 |
0 |
100000 |
Completed |
356 |
2012-2013 |
C.C Road in Bhaskarapeta B.C Colony, Chinnagottigallu Mandal, Chittoor District. |
Chinnagottigallu |
Chinnagottigallu |
5/8/2013 |
100000 |
100000 |
0 |
100000 |
Completed |
357 |
2012-2013 |
Formation of Road Gajulavaripalle to Managalampeta road Diguvavuri G.P, Chinnagottigallu Mandal, Chittoor District. |
Chinnagottigallu |
Diguvavuri GP |
5/8/2013 |
100000 |
100000 |
0 |
100000 |
Completed |
358 |
2012-2013 |
Formation of Road Chandrasekharapuram to Gandhinagar, Bodabandla G.P, Chittoor District. |
Bodabandla GP |
Bodabandla GP |
5/8/2013 |
150000 |
150000 |
0 |
150000 |
Completed |
359 |
2012-2013 |
Formation of Road to Bodidevarapalle link road to 48 Basivireddypalle Road, Chittoor District. |
Basivireddypalle Road |
Basivireddypalle Road |
5/8/2013 |
200000 |
200000 |
0 |
200000 |
Completed |
360 |
2012-2013 |
Formation of Gravel Road, Podalapalle to Graveyanid, Venkatapuram G.P, S.R Puram Mandal, Chittoor District. |
S.R Puram |
Venkatapuram GP |
5/8/2013 |
50000 |
50000 |
0 |
50000 |
Completed |
361 |
2012-2013 |
Formation of Gravel Road Mangunta to Basireddypalle H.W, Thayyuru G.P S.R Puram Mandal, Chittoor District. |
S.R Puram |
Thayyuru GP |
5/8/2013 |
50000 |
50000 |
0 |
50000 |
Completed |
362 |
2012-2013 |
Formation of Gravel Road, Chilamakulapalle to Venkatapuram, A.M Puram G.P, S.R.Puram Mandal, Chittoor District. |
S.R Puram |
A.M.Puram GP |
5/8/2013 |
50000 |
50000 |
0 |
50000 |
Completed |
363 |
2012-2013 |
C.C Road in CherlopalleG.P, Thavanampalle Mandal, Chittoor District. |
Thavanampalle |
Cherlopalle GP |
5/8/2013 |
150000 |
150000 |
0 |
150000 |
Completed |
364 |
2012-2013 |
Laying of B.T.Road From Prathipadu Road to Nimmagaddavaripalem Village, Prathipadu Mandal, Guntur District. |
Prathipadu |
Nimmagaddavaripalem |
5/15/2013 |
1000000 |
1000000 |
0 |
1000000 |
Completed |
365 |
2012-2013 |
Compound Wall and Improvement of Hindu Burrial Ground, Lingaraopalem Village of Edlapadu Mandal, Guntur District. |
Edlapadu |
Lingaraopalem |
5/24/2013 |
1000000 |
1000000 |
0 |
1000000 |
Completed |
366 |
2012-2013 |
Construction of Burial Ground Compound Wall in Chadalawada Village in Vemuru Mandal, Guntur District. |
Vemuru |
Chadalawada |
5/24/2013 |
500000 |
500000 |
0 |
500000 |
Completed |
367 |
2012-2013 |
Constructon of Burial Ground Compound Wall in Kakarlamudi Village of Vemuru Mandal, Guntur District. |
Vemuru |
Kakarlamudi |
5/24/2013 |
500000 |
500000 |
0 |
500000 |
Completed |
368 |
2012-2013 |
Construction of Rajaka Community Hall in Vadisaleru Village of Rangampeta Mandal, East Godavari District. |
Rangampeta |
Vadisaleru |
5/30/2013 |
500000 |
500000 |
0 |
497244 |
Completed |
369 |
2012-2013 |
Construction of Nayibrahmin Community Hall in Vadisaleru Village, of Rangampeta Mandal, East Godavari Districr. |
Rangampeta |
Vadisaleru |
5/30/2013 |
500000 |
500000 |
0 |
495933 |
Completed |
370 |
2012-2013 |
Providing of Street Lights at Chevella Village in Chevella (M) Chevella Constituency Ranga Reddy District. |
Chevella |
Chevella |
6/18/2013 |
500000 |
500000 |
0 |
500000 |
Completed |
371 |
2012-2013 |
Providing of Street Lights at Kethireddy pally Village in Moinabad (M) Chevella Constituency, Ranga Reddy District. |
Moinabad |
Kethi Reddy Pally |
6/18/2013 |
500000 |
500000 |
0 |
500000 |
Completed |
372 |
2012-2013 |
Laying of CC road From Culverts to Door No.24-138 @ Usha nagar Colony, Chittoor District. |
Chittoor |
Usha Nagar Colony |
6/23/2013 |
500000 |
500000 |
0 |
500000 |
Completed |
373 |
2012-2013 |
Construction of Road from R&B road to V.Raghavendra Rao field in Kalavapamula (V) in Vuyyuru (M) |
VUYYURU |
KALAVAPAMULA |
5/5/2012 |
500000 |
500000 |
0 |
495633 |
Completed |
374 |
2012-2013 |
Construction of CC road from Gandreddi Adinarayana house to V.Ramulu House in Thandanki (V) Pamidimukkala (M) |
PAMIDIMUKKALA |
TADANKI |
8/7/2012 |
450000 |
450000 |
0 |
449435 |
Completed |
375 |
2012-2013 |
Construction of CC road from Puppala Vijayalakshmi house to P.Subbarao House in Thadanki (V) Pamidimukkala (M) |
PAMIDIMUKKALA |
TADANKI |
8/7/2012 |
350000 |
350000 |
0 |
349999 |
Completed |
376 |
2012-2013 |
Construction of CC road from Upparla Ramalayam to Jutru Yedukundalu House in Tadanki (V) Pamidimukkala (M) |
PAMIDIMUKKALA |
TADANKI |
8/7/2012 |
280000 |
280000 |
0 |
279174 |
Completed |
377 |
2012-2013 |
Providing Lift Irrigation Scheme at Pendayala (V) in Kanchikacherla (M) |
KANCHIKACHERLA |
PENDYALA |
8/28/2012 |
1155000 |
1155000 |
0 |
963734 |
Completed |
378 |
2012-2013 |
Water supply with Distribution at Pendayala (V) in Kanchikacherla (M) |
KANCHIKACHERLA |
PENDYALA |
8/28/2012 |
192000 |
192000 |
0 |
182076 |
Completed |
379 |
2012-2013 |
Providing BT surface Dressing to the road from T.V.V.Road to Srinivasa Collage road in Vuyyuru (V) and (M) |
VUYYURU |
VUYYURU |
9/8/2012 |
500000 |
500000 |
0 |
494573 |
Completed |
380 |
2012-2013 |
Construction of Karmal Bhavan Rudra Bhami Division No.14 Ramalingeswara Nagar Vijayawada Corp |
VIJAYAWADA CORP |
14TH DIVISION |
11/29/2013 |
1000000 |
1000000 |
0 |
999588 |
Completed |
381 |
2012-2013 |
Construction of RCC slab culvert in ST area near ST colony of Karamcherdu(V)&(M) Prakasam Dist |
Prakasam |
Karamcherdu |
10/25/2016 |
600000 |
600000 |
0 |
600000 |
Completed |
382 |
2012-2013 |
Providing internal CC road in ST locality of Chinaganjam(V)&(M) Ongole Dist |
Ongole |
Chinaganjam |
9/12/2017 |
500000 |
500000 |
0 |
500000 |
Completed |
383 |
2013-2014 |
Drinking water Plant, Uppanesanapalle Village, Dharmavaram Mandal, Anantapur District. |
Anantapur |
Dharmavaram |
6/7/2013 |
600000 |
600000 |
0 |
600000 |
Completed |
384 |
2013-2014 |
Construction of Community Hall, Venkanna Puram Village, Kodavalur Mandal, Nellore District.. |
Kodavalur |
Venkanna Puram |
6/12/2013 |
500000 |
500000 |
0 |
500000 |
Completed |
385 |
2013-2014 |
Providing CC Road from SC Colony, Chilaka Prasad Rao (H) to Chavala Bhaskara Rao (H) and kambampati Dasu (H) to Chilaka Nageswara rao (H), in Grandhasiri Village, Atchampet Mandal, Guntur District. |
Atchampet |
Grandhasiri |
6/20/2013 |
500000 |
500000 |
0 |
500000 |
Completed |
386 |
2013-2014 |
Providing CC Road from SC Colony, Sirrapitru (H) to Kambampati Yesu Padma (H) and Chilaka Venkateswarlu (H) to Chilaka Jakraiah (H), in Grandhasiri Village, Atchampet Mandal, Guntur District. |
Atchampet |
Grandhasiri |
6/20/2013 |
500000 |
500000 |
0 |
500000 |
Completed |
387 |
2013-2014 |
Providing CC Road from SC Colony, Chavala Yesu Dasu (H) to Chilaka Veeraiah (H) and Mekala Chinnabbai (H) to Chilaka Yesaiah (H), in Grandhasiri Village, Atchampet Mandal, Guntur District. |
Atchampet |
Grandhasiri |
6/20/2013 |
500000 |
500000 |
0 |
500000 |
Completed |
388 |
2013-2014 |
Formation of CC Road , From SC Colony at Tirumuru Village, In Vakadu Mandal, Gudur Constituency, Nellore District. |
Vakadu |
Thumuru |
6/29/2013 |
300000 |
300000 |
0 |
300000 |
Completed |
389 |
2013-2014 |
Formation of CC Road, From Yadava Colony at Divipalem Panchayat, In Gudur Rural & Mandal, Gudur Constituency, Nellore District. |
Gudur |
Gudur |
6/29/2013 |
300000 |
300000 |
0 |
300000 |
Completed |
390 |
2013-2014 |
Formation of CC Road from SC Colony at Muttembaka Village, in Vakadu Mandal, Gudur Constituency, Nellore District. |
Vakadu |
Muttembaka |
6/29/2013 |
200000 |
200000 |
0 |
200000 |
Completed |
391 |
2013-2014 |
Formation of CC Road from ST Colony at |
Vakadu |
Vavillapalem |
6/29/2013 |
200000 |
200000 |
0 |
200000 |
Completed |
392 |
2013-2014 |
Formation of CC Road from ST Colony at |
Vakadu |
Koduru |
6/29/2013 |
200000 |
200000 |
0 |
200000 |
Completed |
393 |
2013-2014 |
Formation of CC Road from Muslim locality at |
Chilakur |
Palicherlapalem |
6/29/2013 |
150000 |
150000 |
0 |
150000 |
Completed |
394 |
2013-2014 |
Formation of CC Road from ST Colony at Chedimala Village, in Chilakur Mandal |
Chilakur |
Chedimala |
6/29/2013 |
150000 |
150000 |
0 |
150000 |
Completed |
395 |
2013-2014 |
Formation of CC Road in Thallamma Temple from R&B Road to Temple, in Potupalem Panchayat, |
Gudur |
Potupalem Panchayat |
6/29/2013 |
400000 |
400000 |
0 |
400000 |
Completed |
396 |
2013-2014 |
Formation of CC Road in Yerragattapall Village, Vakadu Mandal, Gudur Constituency, Nellore District. |
Gudur |
Yerragattapalli |
6/29/2013 |
250000 |
250000 |
0 |
250000 |
Completed |
397 |
2013-2014 |
Laying of CC Road in Vanjiwaka Village, ST Colony, Kota Mandal, Gudur Constituency, Nellore District. |
Kota |
Vanjiwaka |
6/29/2013 |
500000 |
500000 |
0 |
500000 |
Completed |
398 |
2013-2014 |
Safe Drinking Water Project with RO Technology, Dharmakancha, 11th Ward SC Colony, Jangaon Mandal, Jangaon Constituency, Warangal District. |
Jangaon |
Puram |
8/1/2013 |
371000 |
371000 |
0 |
371000 |
Completed |
399 |
2013-2014 |
Safe Drinking Water Project with RO Technology, Weavers Colony 28th Ward, Jangaon Mandal, Jangaon Constituency, Warangal District. |
Jangaon |
jangaon |
8/1/2013 |
371000 |
371000 |
0 |
371000 |
Completed |
400 |
2013-2014 |
Safe Drinking Water Project with RO Technology, Kuruma Ward, BC Locality, 4&17 Wards, jangaon Mandal, Jangaon Constituency Warangal District. |
Jangaon |
Jangaon |
8/1/2013 |
371000 |
371000 |
0 |
371000 |
Completed |
401 |
2013-2014 |
SC Community Hall, in Takkellapahad Village, Shaligouraram Mandal, Thugathurthy Constituency, Nalgonda District. |
Shaligouraram |
Takkellapahad |
8/5/2013 |
300000 |
300000 |
0 |
300000 |
Completed |
402 |
2013-2014 |
SC Community Hall, In Shalilingotam Mandal, Thugathurthy Constituency, Nalgonda District. |
Shaligouraram |
Shalilingotam |
8/5/2013 |
300000 |
300000 |
0 |
300000 |
Completed |
403 |
2013-2014 |
SC Community Hall, In Perkakondaram Village, Shaligouraram Mandal, Thugathurthy Constituency, Nalgonda District. |
Shaligouraram |
Perkakondaram |
8/5/2013 |
300000 |
300000 |
0 |
300000 |
Completed |
404 |
2013-2014 |
SC Community Hall, in Venkepally Village, Nuthankal Mandal, Thugathurthy Constituency, Nalgonda District. |
Nuthankal |
Venkepally |
8/5/2013 |
300000 |
300000 |
0 |
300000 |
Completed |
405 |
2013-2014 |
SC Community Hall, in Pedda Namile Village, Nuthankal Mandal, Thugathurthy Constituency, Nalgonda District. |
Nuthankal |
Pedda Namile |
8/5/2013 |
300000 |
300000 |
0 |
300000 |
Completed |
406 |
2013-2014 |
SC Community Hall, in Middirala Village, Nuthankal Mandal, Thugathurthy Constituency, Nalgonda District. |
Nuthankal |
Middirala |
8/5/2013 |
300000 |
300000 |
0 |
300000 |
Completed |
407 |
2013-2014 |
SC Community Hall, in Bandlaramaram Village, Thungathurthy Mandal, Thugathurthy Constituency, Nalgonda District. |
Thugathurthy |
Bandlaramaram |
8/5/2013 |
300000 |
300000 |
0 |
300000 |
Completed |
408 |
2013-2014 |
SC Community Hall, in Pasthala Village, Thungathurthy Mandal, Thugathurthy Constituency, Nalgonda District. |
Thungathurthy |
Pasthala |
8/5/2013 |
300000 |
300000 |
0 |
300000 |
Completed |
409 |
2013-2014 |
SC Community Hall, in Mamidipalle Village, Thirumalagiri Mandal, Thugathuthy Constituency, Nalgonda District. |
Thirumalagiri |
Mamidipalle |
8/5/2013 |
300000 |
300000 |
0 |
300000 |
Completed |
410 |
2013-2014 |
SC Community Hall, in Mushipatla Village, Mothkur Mandal, Thugathuthy Constituency, Nalgonda District. |
Mothkur |
Mushipatla |
8/5/2013 |
300000 |
300000 |
0 |
300000 |
Completed |
411 |
2013-2014 |
SC Community Hall, in Mothkur Village, Mothkur Mandal, Thugathuthy Constituency, Nalgonda District. |
Mothkur |
Mothkur |
8/5/2013 |
300000 |
300000 |
0 |
300000 |
Completed |
412 |
2013-2014 |
SC Community Hall, in Kunchemarthy Village, Arvapalli Mandal, Thugathuthy Constituency, Nalgonda District. |
Aravapalli |
Kunchemarthy |
8/5/2013 |
300000 |
300000 |
0 |
300000 |
Completed |
413 |
2013-2014 |
Providing B.T Road from R&B Road to Seetharampuram H/o |
S.Rayavaram |
Pedagummuluru |
8/5/2013 |
2000000 |
2000000 |
0 |
2000000 |
Completed |
414 |
2013-2014 |
Formation of Gravel Road in K musalaiahpeta SC Colony |
Thondangi |
Thondangi |
10/27/2013 |
400000 |
400000 |
0 |
0 |
Not Started |
415 |
2013-2014 |
Formation of Gravel Road in P Kodada SC Area |
Thondangi |
P.Kodada |
10/27/2013 |
400000 |
400000 |
0 |
0 |
Not Started |
416 |
2013-2014 |
Internal CC road in Kotananduru Village, SC Area |
Kotananduru |
Kotananduru |
10/27/2013 |
300000 |
300000 |
0 |
0 |
Not Started |
417 |
2013-2014 |
Excavation of Feeder Channel from A.V.R HNSS Main Canal@Ch.179.4130 km to Feed Jilanicheruv of Pandikunta Tank |
Anantapur |
Vajrakarur |
10/27/2013 |
100000 |
100000 |
0 |
100000 |
Completed |
418 |
2013-2014 |
Excavation of Feeder Channel from A.V.R HNSS Main Canal@Ch.179.4130 km to Feed Venkatampalli Tank Near |
Anantapur |
Vajrakarur |
10/27/2013 |
410000 |
410000 |
0 |
410000 |
Completed |
419 |
2013-2014 |
Excavation of Feeder Channel from A.V.R HNSS Main Canal Ch.191.045 km to Feed Konapuram Tank |
Anantapur |
Uravakonda |
10/27/2013 |
420000 |
420000 |
0 |
420000 |
Completed |
420 |
2013-2014 |
Excavation of Feeder Channel from A.V.R HNSS Main Canal@Ch.176.000 km to Feed Ragulapadu Tank |
Anantapur |
Ragulapadu |
10/27/2013 |
356000 |
356000 |
0 |
356000 |
Completed |
421 |
2013-2014 |
Providing internal Road from Perukavada to ZPHS School at |
Katapur Tadvai |
Katapur Tadvai |
10/27/2013 |
300000 |
300000 |
0 |
300000 |
Completed |
422 |
2013-2014 |
Providing CC Road from R&B Road to P.R. Road at |
Katapur Tadvai |
Katapur Tadvai |
10/27/2013 |
200000 |
200000 |
0 |
200000 |
Completed |
423 |
2013-2014 |
Providing Metal Road from Beerelly to Kamaram, at |
Katapur Tadvai |
Katapur Tadvai |
10/27/2013 |
200000 |
200000 |
0 |
200000 |
Completed |
424 |
2013-2014 |
CONSTRUCTION OF COMMUNITY HALL IN BC LOCALITY |
Warangal |
AUDIPUDI |
4/16/2014 |
350000 |
350000 |
0 |
350000 |
Completed |
425 |
2013-2014 |
C/O OF CC ROAD FROM KEM R&B ROAD TO DW TANK IN NEW SC COLONY |
Prakasam |
kothapatnam |
4/16/2014 |
500000 |
500000 |
0 |
500000 |
Completed |
426 |
2013-2014 |
LAYING OF CC ROAD IN |
Mahabubnagar |
PEDDAMANDADI |
11/18/2013 |
500000 |
500000 |
0 |
500000 |
Completed |
427 |
2013-2014 |
LAYING OF CC ROAD IN |
Mahabubnagar |
PEDDAMANDADI |
11/18/2013 |
500000 |
500000 |
0 |
500000 |
Completed |
428 |
2013-2014 |
cc road in geelavala kandriga bc colony kesava kuppam gp |
Chittoor |
gangadhara |
4/16/2014 |
100000 |
100000 |
0 |
100000 |
Completed |
429 |
2013-2014 |
CC ROAD IN PATTABI NAGAR COLONY, NELLORE GP |
Chittoor |
GANGADHARA |
4/16/2014 |
150000 |
150000 |
0 |
150000 |
Completed |
430 |
2013-2014 |
BUS SHELTER AT TBNR PURAM , NARSIMHAPURAM GP |
Chittoor |
PALASAMUDRAM |
4/16/2014 |
100000 |
100000 |
0 |
100000 |
Completed |
431 |
2013-2014 |
BUS SHELTER IN KANNEKAPURAM |
Chittoor |
PALASAMUDRAM |
4/16/2014 |
100000 |
100000 |
0 |
100000 |
Completed |
432 |
2013-2014 |
CC ROAD IN BOMMEPALLI H.W GP VEDURU KUPPAM MANDAL |
Chittoor |
KUPPAM |
4/16/2014 |
100000 |
100000 |
0 |
100000 |
Completed |
433 |
2013-2014 |
CC ROAD IN CHERLOPALLI GP |
Chittoor |
CHITTOOR |
4/16/2014 |
150000 |
150000 |
0 |
150000 |
Completed |
434 |
2013-2014 |
CC ROAD IN 33 VENKATA PURAM |
Chittoor |
CHITTOOR |
4/16/2014 |
200000 |
200000 |
0 |
200000 |
Completed |
435 |
2013-2014 |
CC Road in Kattakindhapalli H.W basavapalli G.P, Gudipala Mandal, Chittoor Constituency, Chittoor District. |
Chittoor |
GUDIPALA |
4/16/2014 |
100000 |
100000 |
0 |
100000 |
Completed |
436 |
2013-2014 |
CC Road in Sreerangapalli Village & G.P, Gudipala Mandal, Chittoor Constituency, Chittoor District. |
Chittoor |
GUDIPALA |
4/16/2014 |
100000 |
100000 |
0 |
100000 |
Completed |
437 |
2013-2014 |
New Bore Well in Ramanaiah garipalli G.P, Pakala Mandal, Chandragiri Constituency, Chittoor District. |
Chittoor |
PAKALA |
4/16/2014 |
75000 |
75000 |
0 |
75000 |
Completed |
438 |
2013-2014 |
New Borewell in Velapulavari palli H.W, T.T.Palli G.P, Chandragiri Constituency, Chittoor District. |
Chittoor |
CHANDRAGIRI |
4/16/2014 |
75000 |
75000 |
0 |
75000 |
Completed |
439 |
2013-2014 |
CC Road in N.R.Kammapalli G.P, R.C.Puram Mandal, Chandragiri Constituency, Chittoor District. |
Chittoor |
CHANDRAGIRI |
4/16/2014 |
150000 |
150000 |
0 |
150000 |
Completed |
440 |
2013-2014 |
CC Road in Nagalakunta H.W, Bodevandlapalli G.P, Erravaripalem Mandal, Chandragiri Constituency, Chittoor District. |
Chittoor |
ERRAVARIPALEM |
4/16/2014 |
100000 |
100000 |
0 |
100000 |
Completed |
441 |
2013-2014 |
CC Road in Saibulapalli, Nerabilu G.P, Erravaripalem Mandal, Chandragiri Constituency, Chittoor District. |
Chittoor |
ERRAVARIPALEM |
4/16/2014 |
100000 |
100000 |
0 |
100000 |
Completed |
442 |
2013-2014 |
CC Road in Arigilavaripalli, Panabakam G.P, Chandragiri Mandal, Chandragiri Constituency, Chittoor District. |
Chittoor |
CHANDRAGIRI |
4/16/2014 |
150000 |
150000 |
0 |
150000 |
Completed |
443 |
2013-2014 |
Formation of Gravel Road from Thippireddigaripalli R&B Road to Uravapativaripalli House, Chinnagothal Mandal, Chandragiri Constituency, Chittoor District. |
Chittoor |
CHINNAGOTHAL |
4/16/2014 |
300000 |
300000 |
0 |
300000 |
Completed |
444 |
2013-2014 |
New Bore well in Krishnapuram, Smudrampalli G.P, Palamaner(Rural), Palamaner Constituency, Chittoor District. |
Chittoor |
PALAMANER |
4/16/2014 |
70000 |
70000 |
0 |
70000 |
Completed |
445 |
2013-2014 |
New Borewell in Malleru H.W, Kallupalli G.P, with 250 mts pipe line, Gngavaram Mandal, (Rural) Palamaner Constituency, Chittoor District. |
Chittoor |
PALAMANER |
4/16/2014 |
100000 |
100000 |
0 |
100000 |
Completed |
446 |
2013-2014 |
CC Road in BC Colony Lakkanapalli Bireddy palli Mandal, Palamaner Constituency, Chittoor District. |
Chittoor |
BIREDDY PALLI |
4/16/2014 |
150000 |
150000 |
0 |
150000 |
Completed |
447 |
2013-2014 |
CC Road in Boya Veedhi, Sakarasalapeta GP, Pedhapanjani Mandal, Palamaner Constituency, Chittoor District. |
Chittoor |
PEDHAPANJANI |
4/16/2014 |
100000 |
100000 |
0 |
100000 |
Completed |
448 |
2013-2014 |
CC Road in Venugopalapuram Yadamarri GP, Yadamari Mandal, Putalapattu Constituency, Chittoor District. |
Chittoor |
PUTLAPATTU |
4/16/2014 |
150000 |
150000 |
0 |
150000 |
Completed |
449 |
2013-2014 |
CC Road in Nagireddypalli, Putalapattu GP & Mandal, Putalapattu Constituency, Chittoor District. |
Chittoor |
PUTALAPATTU |
4/16/2014 |
150000 |
150000 |
0 |
150000 |
Completed |
450 |
2013-2014 |
New Bore well in Karuduvaripalli H.W GP, Bangarupalem Mandal, Putalapattu Constituency, Chittoor District. |
Chittoor |
BANGARUPALEM |
4/16/2014 |
100000 |
100000 |
0 |
100000 |
Completed |
451 |
2013-2014 |
New Bore Well in V.S Agraharam Nagavandla GP, Irala Mandal, Putalapattu Constutuency |
Chittoor |
IRALA |
4/16/2014 |
50000 |
50000 |
0 |
50000 |
Completed |
452 |
2013-2014 |
Provision of pump Set for Kodarajukalava, Tavanampalli Mandal, Putalapattu Constituency, Chittoor District. |
Chittoor |
TAVANAMPALLI |
4/16/2014 |
100000 |
100000 |
0 |
100000 |
Completed |
453 |
2013-2014 |
Construction of CC Road in Kotha Arur in Nindra Mandal, Chittoor District. |
Chittoor |
NINDRA |
4/16/2014 |
500000 |
500000 |
0 |
500000 |
Completed |
454 |
2013-2014 |
Construction of BT Road From Buthumali Village to Tenali kolluru R&B Road, Vemuru Mandal, Vemuru Constituency, Guntur District. |
Guntur |
VEMURU |
4/16/2014 |
1000000 |
1000000 |
0 |
1000000 |
Completed |
455 |
2013-2014 |
Drinking Water Plants in Obulayapalle Village, Chegerla Mandal, Sri Potti Sriramulu Nellore District. |
Nellore |
CHEGERLA |
4/16/2014 |
655000 |
655000 |
0 |
655000 |
Completed |
456 |
2013-2014 |
Drinking Water Plant in Thopugunta Village, Kaluvaya Mandal, Sri Potti Sriramulu Nellore District. |
Nellore |
KALUVAYA |
4/16/2014 |
655000 |
655000 |
0 |
655000 |
Completed |
457 |
2013-2014 |
Construction of CC Road from School to R&B Road at Pedaravipadu Village in Naaidupalem GP, Mundlamur Mandal, Prakasam District. |
Prakasam |
MUNDLAMUR |
4/16/2014 |
500000 |
500000 |
0 |
500000 |
Completed |
458 |
2013-2014 |
Metalling the Road from Mareddypalli to Nadimpalli in Mareddipalli Village of Darsi Mandal, Prakasam District. |
Prakasam |
DARSI |
4/16/2014 |
500000 |
500000 |
0 |
500000 |
Completed |
459 |
2013-2014 |
Formation of CC Road from R&B Road to Anjaneya Swamy Temple in Veluguvaripalem Village, Tallur Mandal, Prakasam District. |
Prakasam |
TALLUR |
4/16/2014 |
500000 |
500000 |
0 |
500000 |
Completed |
460 |
2013-2014 |
CC Road BC Colony(Kodela Sivaprasad colony) Visapalem Village, Narasaraopet Mandal, Guntur District. |
Guntur |
NARASARAOPET |
4/16/2014 |
500000 |
500000 |
0 |
500000 |
Completed |
461 |
2013-2014 |
CC Road BC Colony Kesanupalli Village, Narasaraopet Mandal, Guntur District. |
Guntur |
NARASARAOPET |
4/16/2014 |
500000 |
500000 |
0 |
500000 |
Completed |
462 |
2013-2014 |
CC Road Main Road Narasaraopet Donka, Aravapalli Village, Narasaraopet Mandal, Guntur District. |
Guntur |
NARASARAOPET |
4/16/2014 |
500000 |
500000 |
0 |
500000 |
Completed |
463 |
2013-2014 |
CC Road Boddurai to Ramalayam Atchiahpalem Village, Rompicherla Mandal, Guntur District. |
Guntur |
NARASARAOPET |
4/16/2014 |
500000 |
500000 |
0 |
500000 |
Completed |
464 |
2013-2014 |
Laying of CC Road at Tinnelapudi Village, Kota Mandal, Nellore District. |
Nellore |
KOTA |
4/16/2014 |
500000 |
500000 |
0 |
500000 |
Completed |
465 |
2013-2014 |
DW Bore Well at Nammivari Residency in Dubbupalem Village, Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
45000 |
45000 |
0 |
45000 |
Completed |
466 |
2013-2014 |
Formation of CC Road in D.Butchyyapeta Duddupalem Village, SC Area, Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
100000 |
100000 |
0 |
100000 |
Completed |
467 |
2013-2014 |
DW Bore Well at Vutada Dalinaidu kallalu in D.Butchayyapeta, Duddupalem Village, Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
25000 |
25000 |
0 |
25000 |
Completed |
468 |
2013-2014 |
DW Bore Well at Guard gari Kallalu Duddupalem Village, Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
45000 |
45000 |
0 |
45000 |
Completed |
469 |
2013-2014 |
DW Bore Well Near Adarivari Seemunapalli Village,Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
25000 |
25000 |
0 |
25000 |
Completed |
470 |
2013-2014 |
DW Bore Well at Yallapuvari Kallalu, Seemunapalli Village, Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
25000 |
25000 |
0 |
25000 |
Completed |
471 |
2013-2014 |
Construcion of Culvert for Burial Ground Seemunapalli Village, SC AREA, Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
200000 |
200000 |
0 |
200000 |
Completed |
472 |
2013-2014 |
DW Bore Well at SC Colony Rayapurajupeta Village,Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
45000 |
45000 |
0 |
45000 |
Completed |
473 |
2013-2014 |
DW Bore Well at Ganesh Nagar, Amberupuram Village, Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
45000 |
45000 |
0 |
45000 |
Completed |
474 |
2013-2014 |
DW Bore Well at Beesetti Simhachalam Kallalu Bogapuram Village, Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
25000 |
25000 |
0 |
25000 |
Completed |
475 |
2013-2014 |
DW Bore Well at Doddikanakaiaha kallalu Bogapuram Village, Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
25000 |
25000 |
0 |
25000 |
Completed |
476 |
2013-2014 |
DW Bore Well at 9th Ward Bogapuram Village,Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
45000 |
45000 |
0 |
45000 |
Completed |
477 |
2013-2014 |
DW Bore Well at Kondappa Gari Kallalu Govada Village, Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
25000 |
25000 |
0 |
25000 |
Completed |
478 |
2013-2014 |
DW Bore Well at Bandivari kallalu Govada Village,Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
25000 |
25000 |
0 |
25000 |
Completed |
479 |
2013-2014 |
DW Bore Well at Kondapeta Govada Village SC AREA, Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
45000 |
45000 |
0 |
45000 |
Completed |
480 |
2013-2014 |
DW Bore Well in 1st ward Govada Village, Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
45000 |
45000 |
0 |
45000 |
Completed |
481 |
2013-2014 |
DW Bore Well at Dobighat Gajapathinagaram Village, Chodavaram Mandal, Visakhapatnam District. DW Bore Well at Dobighat Gajapathinagaram Village, Chodavaram Mandal, Visakhapatnam District. DW Bore Well at Dobighat Gajapathinagaram Village, Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
45000 |
45000 |
0 |
45000 |
Completed |
482 |
2013-2014 |
DW Bore Well Near Maddala Subba rao House Gajapathinagaram Village, Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
45000 |
45000 |
0 |
45000 |
Completed |
483 |
2013-2014 |
Construction of Steps at Rajukula Revu near Sarada River Gajapathinagaram Village, SC Area, Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
150000 |
150000 |
0 |
150000 |
Completed |
484 |
2013-2014 |
DW Bore Well at Maddala Sannarao Kallalu Gajapathinagaram Village, Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
25000 |
25000 |
0 |
25000 |
Completed |
485 |
2013-2014 |
DW Bore Well at Jami Sathyanarayana Kallalu , Near Anjaneya Swamy Temple, Juttada Village,Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
25000 |
25000 |
0 |
25000 |
Completed |
486 |
2013-2014 |
DW Bore Well at Vegivari Kallalu Juttada Village,Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
25000 |
25000 |
0 |
25000 |
Completed |
487 |
2013-2014 |
DW Bore Well at Mallavari Kallalu, Juttada Village,Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
25000 |
25000 |
0 |
25000 |
Completed |
488 |
2013-2014 |
DW Bore Well at Aithavari Kallalu Juttada Village,Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
25000 |
25000 |
0 |
25000 |
Completed |
489 |
2013-2014 |
DW Bore Well at BC Colony, Juttada Village, Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
25000 |
25000 |
0 |
25000 |
Completed |
490 |
2013-2014 |
DW Bore Well at Salipeta Lakkavaram Village,Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
45000 |
45000 |
0 |
45000 |
Completed |
491 |
2013-2014 |
DW Bore Well at Opp High School, Lakkavaram Village, Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
45000 |
45000 |
0 |
45000 |
Completed |
492 |
2013-2014 |
DW Bore Well at Sharrabhulu Veedhi, Lakkavaram Village, Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
45000 |
45000 |
0 |
45000 |
Completed |
493 |
2013-2014 |
Formation of Gravel & Metal road From Lakkavaram Malampeta road to Tachupallivari kallalu, Lakkavaram Village, SC AREA, Chodavaram Mandal, Visakhapatnam District. |
Visakhapatnam |
CHODAVARAM |
4/16/2014 |
200000 |
200000 |
0 |
200000 |
Completed |
494 |
2013-2014 |
Construction of Balance work of Common Hall at Salivahana Area Wanaparthy Village, Wanaparthy Mandal, Mahabubnagar Mandal. |
Mahabubnagar |
WANAPARTHY |
4/16/2014 |
150000 |
150000 |
0 |
150000 |
Completed |
495 |
2013-2014 |
Construction of Balance work of Nehru youth Building, Wanaparthy Village, Wanaparthy Mandal, Mahabubnagar Mandal. |
Mahabubnagar |
WANAPARTHY |
4/16/2014 |
100000 |
100000 |
0 |
100000 |
Completed |
496 |
2013-2014 |
Construction of Balance work of Youth Building at Metpalli Village, Wanaparthy Mandal, Mahabubnagar Mandal. |
Mahabubnagar |
WANAPARTHY |
4/16/2014 |
100000 |
100000 |
0 |
100000 |
Completed |
497 |
2013-2014 |
Construction of Balance work of Common Hall, Chennur Village, Gopalpet Mandal, Mahabubnagar District. |
Mahabubnagar |
GOPALPET |
4/16/2014 |
200000 |
200000 |
0 |
200000 |
Completed |
498 |
2013-2014 |
Construction of Compound wall for the Veterinary Hospital Khilla Ghanapur Village, Khilaghanpoor Mandal, Mahabubnagar District. |
Mahabubnagar |
KHILAGHANPOOR |
4/16/2014 |
250000 |
250000 |
0 |
250000 |
Completed |
499 |
2013-2014 |
Construction of Common Hall in Chavidi area Balijapalli – Janagamayapalli Village, Khilaghanpoor Mandal, Mahabubnagar District. |
Mahabubnagar |
KHILAGHANPOOR |
4/16/2014 |
150000 |
150000 |
0 |
150000 |
Completed |
500 |
2013-2014 |
Laying of CC Road in Singari Village, Vepada Mandal, Vizianagaram District. |
Vizianagaram |
VEDAPA |
4/16/2014 |
100000 |
100000 |
0 |
0 |
Not Started |
501 |
2013-2014 |
Laying of CCRoad in K.R.Peta Village, Vepada Mandal, Vizianagaram District. |
Vizianagaram |
VEDAPA |
4/16/2014 |
100000 |
100000 |
0 |
0 |
Not Started |
502 |
2013-2014 |
Laying of CC road in Athava Village, Vepada Mandal, Vizianagaram District. |
Vizianagaram |
VEDAPA |
4/16/2014 |
100000 |
100000 |
0 |
0 |
Not Started |
503 |
2013-2014 |
Laying of CC Road in Chamalapalli Village, SC Colony, Vepada Mandal, Vizianagaram District. |
Vizianagaram |
VEDAPA |
4/16/2014 |
100000 |
100000 |
0 |
0 |
Not Started |
504 |
2013-2014 |
Laying of CC road in Gudivada Village, SC Colony, Vepada Mandal, Vizianagaram District. |
Vizianagaram |
VEDAPA |
4/16/2014 |
100000 |
100000 |
0 |
0 |
Not Started |
505 |
2013-2014 |
Laying of CC road in Dungada Village, ST Colony, Vepada Mandal, Vizianagaram District. |
Vizianagaram |
VEDAPA |
4/16/2014 |
100000 |
100000 |
0 |
0 |
Not Started |
506 |
2013-2014 |
Laying of CC Road in Jaggayyapeta Village, Vepada Mandal, Vizianagaram District. |
Vizianagaram |
VEDAPA |
4/16/2014 |
100000 |
100000 |
0 |
0 |
Not Started |
507 |
2013-2014 |
Laying of CC Road in Mukundapuram Village, Vepada Mandal, Vizianagaram District. |
Vizianagaram |
VEDAPA |
4/16/2014 |
100000 |
100000 |
0 |
0 |
Not Started |
508 |
2013-2014 |
Laying of CC Road in Obalayyapalem Village, Vepada Mandal, Vizianagaram District. |
Vizianagaram |
VEDAPA |
4/16/2014 |
100000 |
100000 |
0 |
0 |
Not Started |
509 |
2013-2014 |
Construction of Community Hall at Karakavalasa Village, Vepada Mandal, Vizianagaram District. |
Vizianagaram |
VEDAPA |
4/16/2014 |
100000 |
100000 |
0 |
0 |
Not Started |
510 |
2013-2014 |
Construction of CC Road from Syambabu Gari Church to S Nageswararao house at Maruthi Nagar, SC AREA of Venkatepuram Village, |
West Godavari |
ELURU |
4/16/2014 |
500000 |
500000 |
0 |
496362 |
Completed |
511 |
2013-2014 |
Construction of CC Road from SK Fathimunneesa House to Anjaneya Swamy Temple at Maruthi Nagar, SC AREA of Venkatepuram Village, Eluru Mandal, West Godavari District. |
West Godavari |
ELURU |
4/16/2014 |
500000 |
500000 |
0 |
493824 |
Completed |
512 |
2013-2014 |
Providing B.T Road from Ambedkar Statue to G.Esupadam House and P.Gangadhara Rao House to K.Rattayya House at Ammapalem Village, Pedavegi Mandal, Denduluru Constituency, West Godavari District. |
West Godavari |
PEDAVEGI |
4/16/2014 |
500000 |
500000 |
0 |
487089 |
Completed |
513 |
2013-2014 |
Providing C.C Road from Mareedu Venkateswararao House to Ramalayam at Bhogapuram Village, Pedavegi Mandal, Denduluru Constituency, West Godavari District. |
West Godavari |
PEDAVEGI |
4/16/2014 |
500000 |
500000 |
0 |
498636 |
Completed |
514 |
2013-2014 |
Providing B.T Road from E J Road to Ramalayam in B C Area Area of Vegiwada Village, Pedavegi Mandal, Denduluru Constituency, West Godavari District. |
West Godavari |
VEGIWADA |
4/16/2014 |
500000 |
500000 |
0 |
481866 |
Completed |
515 |
2013-2014 |
Providing B.T Road from G.Laxmana House to Upparla Srinivasarao at Lakshmipuram R&B Road to K.Chandra Rao house at Kothuru of Pothunuru Village, Denduluru Constituency, West Godavari District. |
West Godavari |
DENDULURU |
4/16/2014 |
800000 |
800000 |
0 |
709555 |
Completed |
516 |
2013-2014 |
Construction of CC Road in SC Colony (Ramnagar Adarsha Colony) of Janakavaram Village, in J.Pangulur Mandal, of Prakasam District. |
Prakasam |
J PANGULUR |
4/16/2014 |
500000 |
500000 |
0 |
500000 |
Completed |
517 |
2013-2014 |
Providing Internal CC Road From Kodury Venkateswara Rao House to Sunkavalli Krishna House of Singarajupalem in Nallajerla Mandal, West Godavari District. |
West Godavari |
NALLAJERLA |
4/16/2014 |
900000 |
900000 |
0 |
838930 |
Completed |
518 |
2013-2014 |
LAYING OF CC ROAD IN CHERUVU MANDAL THANDA |
Mahabubnagar |
SAVAIGUDEM |
4/25/2014 |
300000 |
300000 |
0 |
300000 |
Completed |
519 |
2013-2014 |
CONSTRUCTION OF COMMUNITY HALL IN SC COLONY |
Mahabubnagar |
MANGAMPALLI |
4/25/2014 |
250000 |
250000 |
0 |
250000 |
Completed |
520 |
2013-2014 |
CONSTRUCTION OF COMMON HALL IN MINORITY LOCALITY AT |
Mahabubnagar |
SOLIPUR |
4/25/2014 |
200000 |
200000 |
0 |
200000 |
Completed |
521 |
2013-2014 |
Construction of CC Road From Sri Kandula balaiah House to Sri Komara Battina Raja Rao House in SC Colony in Uppugundur Village, N.G Padu Mandal, Prakasam District. |
Prakasam |
uppugundur |
7/28/2014 |
500000 |
500000 |
0 |
500000 |
Completed |
522 |
2013-2014 |
Construction of BT road from NH.5 to Yalamanchili Rajedraprasad house(via)Milk Center&Liberary in Atkuru(V) of Unguturu (M) |
UNGUTURU |
ATKURU |
8/8/2013 |
1400000 |
1400000 |
0 |
1223792 |
Completed |
523 |
2013-2014 |
Construction of slab Culvert to Nallavagu in Adaviravulapadu(V) at Nangigama(M) |
NANDIGAMA |
ADIVIRAVULAPADU |
12/20/2013 |
1000000 |
1000000 |
0 |
999995 |
Completed |
524 |
2013-2014 |
Metailing the road from Kosuru to Mantripalem of Movva(M) |
MOVVA |
KOSURU |
1/8/2014 |
1000000 |
1000000 |
0 |
995090 |
Completed |
525 |
2013-2014 |
Providing of CC road from A.B.Rao colony in Saipuram(V) of Vuyyuru(M) |
VUYYURU |
SAIPURAM |
2/13/2014 |
500000 |
500000 |
0 |
375000 |
Completed |
526 |
2013-2014 |
Providing CC road and Drains at Lingala (V) of Vatsavai(M) |
VATSAVAI |
LINGALA |
2/23/2014 |
2500000 |
2500000 |
0 |
1875000 |
Completed |
527 |
2013-2014 |
Providing CC road from Sri Garapati Ranga Rao house to Sri Davuluri Setarama Dasu house at Pallerlamudi(V) of Nuzvid(M) |
NUZVID |
PALLERLAMUDI |
3/1/2014 |
500000 |
500000 |
0 |
498675 |
Completed |
528 |
2013-2014 |
Providing CC road from Community hall in HW to Sri Silarapu Venkateswara Rao house at Pallerlamudi(V) of Nuzvid(M) |
NUZVID |
PALLERLAMUDI |
3/1/2014 |
500000 |
500000 |
0 |
499985 |
Completed |
529 |
2013-2014 |
Providing Gravelling road from NH9(Byepass) to Gude Narasimhara Rao field at Paritala(V) of Kanchikacherla(M) |
KANCHIKACHERLA |
PARITALA |
3/1/2014 |
500000 |
500000 |
0 |
499999 |
Completed |
530 |
2013-2014 |
Providing Gravelling road from G.Narasimha rao field to Koganti Apparao field at Paritala(V) of Kanchikacherla(M) |
KANCHIKACHERLA |
PARITALA |
3/1/2014 |
500000 |
500000 |
0 |
499999 |
Completed |
531 |
2013-2014 |
Providing gravelling road from Koganti Apparao filed to C.V.Road at Paritala(V) of Kanchikacherla(M) |
KANCHIKACHERLA |
PARITALA |
3/1/2014 |
500000 |
500000 |
0 |
499999 |
Completed |
532 |
2013-2014 |
Costruction of community hall over the godown of PACS Kakulapadu(V) Bapulapadu(M) |
BAPULAPADU |
KAKULAPADU |
5/23/2014 |
1050000 |
1050000 |
0 |
871255 |
Completed |
533 |
2013-2014 |
Providing I.M.2 hand pump at Movva road in Penumatcha(V) of Pamidimukkala(M) |
PAMIDIMUKKALA |
PENUMATCHA |
5/23/2014 |
63000 |
63000 |
0 |
43096 |
Completed |
534 |
2013-2014 |
Providing CC road in Ponnavaram (V) Veerullpadu(M) |
VEERULLAPADU |
PONNAVARAM |
5/23/2014 |
1000000 |
1000000 |
0 |
750000 |
Completed |
535 |
2013-2014 |
Construction of Anganwadi Building in SCs/STs area in Penumatcha(V) of Pamidimukkala(M) |
PAMIDIMUKKALA |
PENUMATCHA |
6/24/2014 |
600000 |
600000 |
0 |
0 |
Not Started |
536 |
2013-2014 |
Providing CC road from Madineni Adinarayana house to Brahman gari temple in Kotha Cheruvukommulapalem(V) of Nuzendla(M) Guntur Dist |
Guntur |
Cheruvukommulapalem |
9/26/2015 |
500000 |
500000 |
0 |
500000 |
Completed |
537 |
2013-2014 |
One E-Waste management truck to pochavaram(V) Vastavai(M) |
VATSAVAI |
POCHAVARAM |
10/13/2016 |
175920 |
175920 |
0 |
0 |
Not Started |
538 |
2013-2014 |
One E-Waste management truck to Gangavalli(V) Vastavai(M) |
VATSAVAI |
GANGAVALLI |
10/13/2016 |
175920 |
175920 |
0 |
0 |
Not Started |
539 |
2013-2014 |
Procument of One E-Weste Management Truck to palaparru(V) of Pedanandipadu(M) Guntur District |
Guntur |
palaparru |
11/7/2016 |
175920 |
175920 |
0 |
0 |
Not Started |
540 |
2013-2014 |
Construction of new block for divyangula seva kendram NGO (Jaipur foot Center) |
Nellore |
Somasekharapuram |
6/24/2016 |
1500000 |
1500000 |
0 |
1500000 |
Completed |
541 |
2013-2014 |
Providing internal CC road approach road to SC colony main in A.B.Palem(V) of Pedanandipadu (M) |
Guntur |
Pedanandipadu |
6/9/2018 |
1300000 |
650000 |
650000 |
650000 |
Completed |
542 |
2014-2015 |
Laying of CC road from Hanumanthappa house to Chinnappa Reddy house Nayanapalli(V) Lepakshi(M) Anantapur District |
Anantapur |
Nayanapalli |
8/12/2015 |
200000 |
200000 |
0 |
200000 |
Completed |
543 |
2014-2015 |
Laying of CC road from Y.Nagaraju hospital to Gadiya Chari house Pulamathi(V) Lepakshi(M) Anantapur Dist |
Anantapur |
Pulamathi |
8/12/2015 |
100000 |
100000 |
0 |
100000 |
Completed |
544 |
2014-2015 |
Providing CC road from Thippa Reddy house to Rami Reddy house Kothapalli H/o Kodipalli (V) of Lepakshi(M) Anantapur Dist |
Anantapur |
Kodipalli |
8/12/2015 |
200000 |
200000 |
0 |
200000 |
Completed |
545 |
2014-2015 |
Providing CC road from Veerajavan house to MPP School Kodipalli(V) Lepakshi (M) Anantapur Dist |
Anantapur |
Kodipalli |
8/12/2015 |
200000 |
200000 |
0 |
200000 |
Completed |
546 |
2014-2015 |
Laying of CC road from Sadlapalli - Kotipi road to MPP school Tilak Nagar H/o Palamathi(V) Lepakshi(M) Anantapur Dist |
Anantapur |
Palamathi |
8/12/2015 |
200000 |
200000 |
0 |
200000 |
Completed |
547 |
2014-2015 |
Laying of CC road from Anjinappa house to Neeruganthi Anjinappa Arumakulapalli H/o Tekulodu(V) Chilamathuru(M) Anantapur Dist |
Anantapur |
Tekulodu |
8/12/2015 |
200000 |
200000 |
0 |
200000 |
Completed |
548 |
2014-2015 |
Laying of CC road from V.Sivareddy house to Angadi Chandra House Venkatapuram H/o Veerapuram (V) Chilamathuru (M) Anatapur Dist |
Anantapur |
Veerapuramu |
8/12/2015 |
150000 |
150000 |
0 |
150000 |
Completed |
549 |
2014-2015 |
Laying of CC road from Anjinappa house to Gangaraju house Morasalapalli(V) Chilamathuru(M) Anantapur Dist |
Anantapur |
Morasalapalli |
8/12/2015 |
250000 |
250000 |
0 |
250000 |
Completed |
550 |
2014-2015 |
Laying of CC road from R&B Main road to Babaiah house bhumaiaha Garipalli H/o Morasalapalli(V) Hindupur(M) Anantapur Dist |
Anantapur |
Morasalapalli |
8/12/2015 |
200000 |
200000 |
0 |
200000 |
Completed |
551 |
2014-2015 |
Laying of CC road from Nanjireddy house to Kondappa house Kaggallu(V) Hindupur(M) Anathapur Dist |
Anantapur |
Kaggallu |
8/12/2015 |
500000 |
500000 |
0 |
500000 |
Completed |
552 |
2014-2015 |
Laying of CC road from V.Adinarayappa house to BC Colony end point somaghatta(V) Chilamathuru(M) Anathapur Dist |
Anantapur |
Somaghatta |
8/12/2015 |
300000 |
300000 |
0 |
300000 |
Completed |
553 |
2014-2015 |
Construction of Community hall first floor AT Daddupalem (V) Chodavaram(M) Visakhapatnam Dist |
Visakhapatnam |
Daddupalem |
12/19/2015 |
1000000 |
1000000 |
0 |
1000000 |
Completed |
554 |
2014-2015 |
Construction of CEC class room-1 Sri Gouri Sankar Jr.Collage(AIDED) Proddatur in YSR Kadapa Dist |
YSR Kadapa |
Proddatur |
4/18/2017 |
498000 |
498000 |
0 |
498000 |
Completed |
555 |
2014-2015 |
Construction of CEC class room-II Sri.Gouri Sankar Jr.Collage(AIDED) Proddatur Kadapa Dist |
YSR Kadapa |
Proddatur |
4/18/2017 |
498000 |
498000 |
0 |
498000 |
Completed |
556 |
2014-2015 |
Providing CC road at Venkatapuram HW of Agaramangalam GP of GD Nellore in Chittoor District |
Chittoor |
GD Nellore |
7/21/2015 |
150000 |
150000 |
0 |
0 |
Not Started |
557 |
2014-2015 |
Providing CC road from At Pambala Palle of Vinajam GP of G.D.Nellore in Chittoor District |
Chittoor |
GD Nellore |
7/21/2015 |
150000 |
150000 |
0 |
0 |
Not Started |
558 |
2014-2015 |
Providing CC road at Etteri of Kotagaram GP of G.D.Nellore in Chittoor District |
Chittoor |
GD Nellore |
7/21/2015 |
200000 |
200000 |
0 |
0 |
Not Started |
559 |
2014-2015 |
Providing CC road At Mukkalathur HW of Mukkalathur GP of GD Nellore in Chittoor District |
Chittoor |
GD Nellore |
7/21/2015 |
150000 |
150000 |
0 |
0 |
Not Started |
560 |
2014-2015 |
Formation of gravel road from Balaganga palle road to Gudlvari Kandriga of pachigunta GP in Minority colony of G.D.Nellore Mandal Nellore Dist |
Nellore |
Nellore |
9/22/2015 |
400000 |
400000 |
0 |
400000 |
Completed |
561 |
2014-2015 |
Fromation of Gravel road from Baliji Kandriga road to Kondlasanddor of pachigunta GP in OC colony of GD Nellore (M) Chittor Dist |
Chittoor |
Chittor |
9/22/2015 |
400000 |
400000 |
0 |
400000 |
Completed |
562 |
2014-2015 |
Formation of Gravel road from Pulla R&B to Ragavaraju puram of S.R.Puram Mandal Chittor Dist |
Chittor |
Chittor |
9/22/2015 |
300000 |
300000 |
0 |
300000 |
Completed |
563 |
2014-2015 |
Providig Fencing work Around the SS tank(Three sides) in Palaparru(V) of Pedanandipadu(M) Guntur Dist |
Guntur |
Palaparru |
10/25/2016 |
500000 |
500000 |
0 |
500000 |
Completed |
564 |
2014-2015 |
Providing Fencing with link mesh for south side of SS tank in Palaparru (V) of Pedanandipadu(M) Guntur Dist |
Guntur |
Palaparru |
10/25/2016 |
500000 |
500000 |
0 |
500000 |
Completed |
565 |
2014-2015 |
Formation and gravelling to the road from Arakativemula to Muchukota of Putlur(M) Anathapur Dist |
Anantapur |
Muchukota |
8/12/2015 |
500000 |
500000 |
0 |
500000 |
Completed |
566 |
2014-2015 |
Formation and gravelling to the road from Arakativemula Muchukota of Putlur(M) Anathapur Dist |
Anantapur |
Muchukota |
8/12/2015 |
500000 |
500000 |
0 |
500000 |
Completed |
567 |
2014-2015 |
Formation of CC road Aravapalli Bhasakara Rao house to Atluri Brahmandam house in Atukuru(V) of Unguturu(M) |
UNGUTURU |
ATKURU |
12/26/2015 |
500000 |
500000 |
0 |
238379 |
Completed |
568 |
2014-2015 |
Formation of CC road Kodali Chandra Sekhar house to Devineni Subba Rao house in Atukuru(V) of Unguturu(M) |
UNGUTURU |
ATKURU |
12/26/2015 |
500000 |
500000 |
0 |
241963 |
Completed |
569 |
2014-2015 |
Construction of Culvert building at Anthaipally(V) of Khilaghanpur(M) Mahabubnagar Dist |
Mahabubnagar |
Anthaipally |
3/1/2016 |
300000 |
300000 |
0 |
300000 |
Completed |
570 |
2014-2015 |
Providing Organic Waste management plant along with air pressure in Ponnavaram(V) of Veerullapadu(M) |
VEERULLAPADU |
PONNAVARAM |
1/28/2016 |
658670 |
658670 |
0 |
0 |
Not Started |
571 |
2014-2015 |
Construction of SC community hall at Tiramalayapally(V) of Khilaghanpur(M) Mahabubnagar Dist. |
Mahabubnagar |
Khilaghanpur |
3/1/2016 |
250000 |
250000 |
0 |
250000 |
Completed |
572 |
2014-2015 |
Laying of CC road at Nagapur(V) of Gopalpet(M) Mahabubnagar Dist |
Mahabubnagar |
Gopalpet |
3/1/2016 |
300000 |
300000 |
0 |
300000 |
Completed |
573 |
2014-2015 |
Laying of CC road and drain at Revally (V) of Gopalpet(M) Mahabubnagar Dist |
Mahabubnagar |
Gopalpet |
3/1/2016 |
300000 |
300000 |
0 |
300000 |
Completed |
574 |
2014-2015 |
Construction of Cultural builidng at Geethakaumika locality at Kamaloddinput(V) of Khilaghanpur(M) Mahabubnagar Dist |
Mahabubnagar |
Khilaghanpur |
3/1/2016 |
300000 |
300000 |
0 |
300000 |
Completed |
575 |
2014-2015 |
Providing Drinking water at Janampet(V) Pebbiar(M) Mahabubnagar Dist |
Mahabubnagar |
Pebbiar |
3/1/2016 |
250000 |
250000 |
0 |
250000 |
Completed |
576 |
2014-2015 |
Construction of Multipurpose hall at Electronic association colony Wanaparthy(V)&(M) Mahabubnagar Dist |
Mahabubnagar |
Wanaparthy |
3/1/2016 |
300000 |
300000 |
0 |
300000 |
Completed |
577 |
2014-2015 |
Construction of Multipurpose hall at RMP colony at Pebbiar(V)&(M) Mahabunagar Dist |
Mahabubnagar |
Pebbiar |
3/1/2016 |
300000 |
300000 |
0 |
300000 |
Completed |
578 |
2014-2015 |
Providing Bore Pump work at Chennur (V) of Gopalpet(M) Mahabubnagar Dist |
Mahabubnagar |
Gopalpet |
3/1/2016 |
38810 |
38810 |
0 |
38810 |
Completed |
579 |
2014-2015 |
Providing Bore pump work at Yedula(V) of Gopalapet (M) Mahabubnagar Dist |
Mahabubnagar |
Gopalpet |
3/1/2016 |
38810 |
38810 |
0 |
38810 |
Completed |
580 |
2014-2015 |
Providing Bore pump at Gopalpet(V)&(M) |
Mahabubnagar |
Gopalpet |
3/1/2016 |
38810 |
38810 |
0 |
38810 |
Completed |
581 |
2014-2015 |
Providing Bore pump work at Laxmithanda Buddaram(V) of Gopalpet (M) Mahabubnagar Dist |
Mahabubnagar |
Gopalpet |
3/1/2016 |
38810 |
38810 |
0 |
38810 |
Completed |
582 |
2014-2015 |
Providing Bore pump work at Salkalpur(V) of Ghanpur(M) Mahabubnagar Dist |
Mahabubnagar |
Ghanpur |
3/1/2016 |
38810 |
38810 |
0 |
38810 |
Completed |
583 |
2014-2015 |
Providing Bore pump work at Mundarithanda Mamidimada(V) of Ghanpur(M) Mahabubnagar Dist |
Mahabubnagar |
Ghanpur |
3/1/2016 |
38810 |
38810 |
0 |
38810 |
Completed |
584 |
2014-2015 |
Providing Bore pump at Thirmalapally(V) of Ghanpur(M) Mahabubnagar Dist |
Mahabubnagar |
Ghanpur |
3/1/2016 |
38810 |
38810 |
0 |
38810 |
Completed |
585 |
2014-2015 |
Providing Bore pump work at Upparipally(V) of Ghanpur(M) Mahabubnagar Dist |
Mahabubnagar |
Ghanpur |
3/1/2016 |
38810 |
38810 |
0 |
38810 |
Completed |
586 |
2014-2015 |
Providing Bore pump work at Manajipet(V) of Ghanpur(M) Mahabubnagar Dist |
Mahabubnagar |
Ghanpur |
3/1/2016 |
38810 |
38810 |
0 |
38810 |
Completed |
587 |
2014-2015 |
Providing Bore pump work at Mohammed Husainpally (V) of Ghanpur(M) |
Mahabubnagar |
Ghanpur |
3/1/2016 |
38810 |
38810 |
0 |
38810 |
Completed |
588 |
2014-2015 |
Providing Bore pump work at Kanchiraopally(V) of Pebbair(M) Mahabubnagar Dist |
Mahabubnagar |
Pebbair |
3/1/2016 |
38810 |
38810 |
0 |
38810 |
Completed |
589 |
2014-2015 |
Providing Bore pump work at Shairpally(V) of Pebbair(M) Mahabubnagar Dist |
Mahabubnagar |
Pebbair |
3/1/2016 |
38810 |
38810 |
0 |
38810 |
Completed |
590 |
2014-2015 |
Providing Bore pump work at Gatlakhanapur(V) Peddamandadi(M) Mahabubnagar Dist |
Mahabubnagar |
Peddamandadi |
3/1/2016 |
38810 |
38810 |
0 |
38810 |
Completed |
591 |
2014-2015 |
Providing Bore pump work at Doduguntapally(V) Peddamandadi(M) Mahabubnagar Dist |
Mahabubnagar |
Peddamandadi |
3/1/2016 |
38810 |
38810 |
0 |
38810 |
Completed |
592 |
2014-2015 |
Providing Bore pump work at Anjanagiri(V) Wanaparthy(M) Mahabubnagar Dist |
Mahabubnagar |
Wanaparthy |
3/1/2016 |
38810 |
38810 |
0 |
38810 |
Completed |
593 |
2014-2015 |
Providing Bore pump work at Savaigudem(V) of Wanaparthy(M) Mahabubnagar Dist |
Mahabubnagar |
Wanaparthy |
3/1/2016 |
38810 |
38810 |
0 |
38810 |
Completed |
594 |
2014-2015 |
Providing Bore pump at 26th ward in Wanaparthy Town in Mahabubnagar Dist |
Mahabubnagar |
Wanaparthy |
3/1/2016 |
38810 |
38810 |
0 |
38810 |
Completed |
595 |
2014-2015 |
Providing Bore pump work at 16th ward in wanaparthy Town in Mahabubnagar Dist |
Mahabubnagar |
Wanaparthy |
3/1/2016 |
38810 |
38810 |
0 |
38810 |
Completed |
596 |
2014-2015 |
Providing bore pump work at 10th ward in Wanaparthy Town in Mahabubnagar Dist |
Mahabubnagar |
Wanaparthy |
3/1/2016 |
38810 |
38810 |
0 |
38810 |
Completed |
597 |
2014-2015 |
Providing Bore pump work at 5th ward in Wanaparthy Town in Mahabubnagar Dist |
Mahabubnagar |
Wanaparthy |
3/1/2016 |
38810 |
38810 |
0 |
38810 |
Completed |
598 |
2014-2015 |
Providing Bore pump work at 18th ward in Wanaparthy Town in Mahabubnagar Dist |
Mahabubnagar |
Wanaparthy |
3/1/2016 |
38800 |
38800 |
0 |
38800 |
Completed |
599 |
2014-2015 |
Construction of Compound wall to TM Rao High school in Bhattiprolu(V)&(M) Guntur Dist |
Guntur |
Bhattiprolu |
3/1/2016 |
1000000 |
1000000 |
0 |
1000000 |
Completed |
600 |
2014-2015 |
Formation of road to upto gravel surface form Anathapur road to Arakatavemala SC Colony in PutluruMandal Reach-I |
Anantapur |
Putlur |
2/14/2017 |
500000 |
500000 |
0 |
500000 |
Completed |
601 |
2014-2015 |
Formation of road to upto gravel surface form Anathapur road to Arakatavemala SC Colony in PutluruMandal Reach-II |
Anantapur |
Putlur |
2/14/2017 |
500000 |
500000 |
0 |
500000 |
Completed |
602 |
2014-2015 |
Formation of road to upto gravel surface form Anathapur road to Arakatavemala SC Colony in PutluruMandal Reach-II |
Anantapur |
Putlur |
2/14/2017 |
500000 |
500000 |
0 |
500000 |
Completed |
603 |
2014-2015 |
Formation of gravel road from ST colony to fields in Pedakonduru(V) of Kaligiri(M) Nellore Dist |
Nellore |
Kaligiri |
10/25/2016 |
500000 |
500000 |
0 |
500000 |
Completed |
604 |
2014-2015 |
Construction of Multipurpose builidng for public usage in pentapadu(V)&(M) |
West Godavari |
Pentapadu |
2/14/2017 |
1150000 |
1150000 |
0 |
1075300 |
Completed |
605 |
2014-2015 |
Reconstruction/rehabilitation works in falsh/landslides and cloud burst effected areas of UttaraKhand |
Uttarakhand |
UttaraKhand |
5/13/2016 |
2500000 |
2500000 |
0 |
2500000 |
Completed |
606 |
2014-2015 |
Formation of the road from Kalavapamula - Katuru R&B road to Yalamanchi Venkatanarasimha Rao (Chinnabai) filed in Kalavapamula(V) of Vuyyuru(M) |
VUYYURU |
KALAVAPAMULA |
11/1/2016 |
1500000 |
1500000 |
0 |
1179168 |
Completed |
607 |
2014-2015 |
Construction of Anganwadi building at Penumatcha of Pamidimukkala(M) |
PAMIDIMUKKALA |
PENUMATCHA |
9/6/2016 |
1200000 |
1200000 |
0 |
1106831 |
Completed |
608 |
2014-2015 |
One E-Waste management truck to Kanchikacherla Mandal |
KANCHIKACHERLA |
KANCHIKACHERLA |
10/13/2016 |
175920 |
175920 |
0 |
0 |
Not Started |
609 |
2014-2015 |
One E-Waste management truck to Jaggaiahpet Mandal |
JAGGAIAHPET |
JAGGAYYAPETA (U) |
10/13/2016 |
175920 |
175920 |
0 |
0 |
Not Started |
610 |
2014-2015 |
One E-Waste management truck to Nandigama Mandal |
NANDIGAMA |
NANDIGAMA (U)(P) |
10/13/2016 |
175920 |
175920 |
0 |
0 |
Not Started |
611 |
2014-2015 |
Providing Additional Amenities to the Community hall in the District Police Office Premises Ongole Prakasam District |
Prakasam |
Prakasam |
10/25/2016 |
2000000 |
2000000 |
0 |
2000000 |
Completed |
612 |
2014-2015 |
Construction of painted stock Enclosure at Kotappakonda EEC (Park Safari) Guntur District |
Guntur |
Kotappakonda |
12/5/2016 |
1100000 |
1100000 |
0 |
1100000 |
Completed |
613 |
2014-2015 |
Purchase of new tractor and water tank of Kotappakonda EEC of Gunturu District |
Guntur |
Kotappakonda |
12/5/2016 |
900000 |
900000 |
0 |
900000 |
Completed |
614 |
2014-2015 |
Providing BT Road from Movva Nageswara Rao house to P.Srirama Sharma house in Penamakuru (V) of Thotlavalluru (M) of Krishna District. |
THOTLAVALLURU |
PENAMAKURU |
5/22/2017 |
1000000 |
1000000 |
0 |
675155 |
Completed |
615 |
2014-2015 |
Providing additional amenities to community hall in Govada(V) of Amarthaluru(M) Guntur Dist |
Guntur |
Govada |
12/8/2016 |
600000 |
600000 |
0 |
600000 |
Completed |
616 |
2014-2015 |
Additional building to village veternary hospital in Govada(V) Amarthaluru(M) Guntur Dist |
Guntur |
Govada |
12/8/2016 |
300000 |
300000 |
0 |
300000 |
Completed |
617 |
2014-2015 |
Construction of CC road from old CC road to nallajonnala Ramaiah house at Kammavaripalem(V) of Jaladanki(M) of SPSR Nellore Dist |
Nellore |
Kammavaripalem |
1/27/2017 |
500000 |
500000 |
0 |
500000 |
Completed |
618 |
2014-2015 |
Construction of CC road from Malineni Malyadri house to P.Chinapenchalaiah house at Kamamvaripalem(V) Jaladanki(M) of SPSR Nellore Dist |
Nellore |
Kammavaripalem |
1/27/2017 |
200000 |
200000 |
0 |
200000 |
Completed |
619 |
2014-2015 |
Construction of CC road from Pinnika Krishnaiah house to T.Subbarao house at BC colony, Kammavaripalem(V) Jaladanki(M) of SPSR Nellore Dist |
Nellore |
Kammavaripalem |
1/27/2017 |
300000 |
300000 |
0 |
300000 |
Completed |
620 |
2014-2015 |
Construction of Community Hall in Palaparru(V) of Pedanandipadu(M) |
Guntur |
Pedanandipadu |
5/20/2018 |
2500000 |
2500000 |
0 |
2500000 |
Completed |
621 |
2014-2015 |
Providing CC road in SC Colony in Somaravandlapalli(V) of Kanaganapalli(M) |
Anantapur |
Kanaganapalli |
8/20/2018 |
220000 |
66000 |
154000 |
66000 |
Completed |
622 |
2014-2015 |
Providing CC road from Naramma house to Somar narasimhulu house, Ramakrishna house, shudhakar house to Ramanna house in Somaravandlapalli(V) of Kanaganapalli(M) |
Anantapur |
Kanaganapalli |
8/20/2018 |
400000 |
120000 |
280000 |
120000 |
Completed |
623 |
2014-2015 |
Providing CC road in BC Colony of Somaravandlapalli(V) in Kanaganapalli(M) |
Anantapur |
Kanaganapalli |
8/20/2018 |
1000000 |
300000 |
700000 |
300000 |
Completed |
624 |
2014-2015 |
Providing CC road from Panchayati building to Ediga Venkatesh house in Narasimepalli(V) of Kanaganapalli(M) |
Anantapur |
Kanaganapalli |
8/20/2018 |
270000 |
81000 |
189000 |
81000 |
Completed |
625 |
2014-2015 |
Providing CC road from Dollaiah Thathaiah temple to Edga in Narasimepalli(V) of Kanaganapalli(M) |
Anantapur |
Kanaganapalli |
8/20/2018 |
1500000 |
450000 |
1050000 |
450000 |
Completed |
626 |
2014-2015 |
Construction of bus shelter in Somaravandlapalli(V) of Kanaganapalli(M) |
Anantapur |
Kanaganapalli |
8/20/2018 |
400000 |
400000 |
0 |
400000 |
Completed |
627 |
2014-2015 |
Construction of compound wall in North side of the Zilla Parishad High School in Ipuru(V) and Mandal |
Guntur |
Ipuru |
8/19/2018 |
500000 |
500000 |
0 |
500000 |
Completed |
628 |
2014-2015 |
Construction of compound wall east side of the Zilla parishad high school in Ipuru(V) and Mandal |
Guntur |
Ipuru |
8/19/2018 |
500000 |
500000 |
0 |
500000 |
Completed |
629 |
2014-2015 |
Construction of Community Hall in Bobbarlanka(V) of Repalle(M) |
Guntur |
Repalle |
11/9/2018 |
1100000 |
1100000 |
0 |
1100000 |
Completed |
630 |
2014-2015 |
Construction of Compound wall to the MPUP School in Gundlapadu(V) of Veldurthi(M) |
Guntur |
Veldurthi |
11/9/2018 |
1000000 |
1000000 |
0 |
1000000 |
Completed |
631 |
2015-2016 |
Establishment of Google fuature class room MPUPS Ponnavaram(V) Veerullapadu(M) |
VEERULLAPADU |
PONNAVARAM |
3/9/2017 |
1034500 |
1034500 |
0 |
1034500 |
Completed |
632 |
2015-2016 |
Establishment of Google future class room ZPHS Nandigama(V)&(M) |
NANDIGAMA |
NANDIGAMA (U)(P) |
3/9/2017 |
1034500 |
1034500 |
0 |
1034500 |
Completed |
633 |
2015-2016 |
Establishment of Google future class room ZPHS Lingalapadu(V) Nandigama(M) |
NANDIGAMA |
LINGALAPADU |
3/9/2017 |
1034500 |
1034500 |
0 |
1034500 |
Completed |
634 |
2015-2016 |
Establishment of Google future class room ZPHS Kanchikacherla(V)&(M) |
KANCHIKACHERLA |
KANCHIKACHERLA |
3/9/2017 |
1034500 |
1034500 |
0 |
1034500 |
Completed |
635 |
2015-2016 |
Establishment of Google future class room ZPHS Pendyala(V) Kanchikacherla(M) |
KANCHIKACHERLA |
PENDYALA |
3/9/2017 |
1034500 |
1034500 |
0 |
1034500 |
Completed |
636 |
2015-2016 |
Establishment of Google future class room ZPHS Paritala(V) Kanchikacherla(M) |
KANCHIKACHERLA |
PARITALA |
3/9/2017 |
1034500 |
1034500 |
0 |
1034500 |
Completed |
637 |
2015-2016 |
Establishment of Google future class room ZPHS Vellanki(V) Veerullapadu(M) |
VEERULLAPADU |
VELLANKI |
3/9/2017 |
1034500 |
1034500 |
0 |
1034500 |
Completed |
638 |
2015-2016 |
Establishment of Google future class room ZPHS Jammavaram(V) Veerullapadu(M) |
VEERULLAPADU |
JAMMAVARAM |
3/9/2017 |
1034500 |
1034500 |
0 |
1034500 |
Completed |
639 |
2015-2016 |
Establishment of Google future class room ZPHS Mulapadu(V) Ibrahimpatnam (M) |
IBRAHIMPATNAM |
MULAPADU |
3/9/2017 |
1034500 |
1034500 |
0 |
1034500 |
Completed |
640 |
2015-2016 |
Establishment of Google future class room ZPHS Ibrahimpatnam(V) & (M) |
IBRAHIMPATNAM |
IBRAHIMPATNAM |
3/9/2017 |
1034500 |
1034500 |
0 |
1034500 |
Completed |
641 |
2015-2016 |
Establishment of Google future class room ZPHS(B) Kondapalli(V) Ibrahimpatnam(M) |
IBRAHIMPATNAM |
KONDAPALLE |
3/9/2017 |
1034500 |
1034500 |
0 |
1034500 |
Completed |
642 |
2015-2016 |
Establishment of Google future class room Sri Narasimha High school (SNHS) Palaparru(V) PedaNandipadu(M) Guntur Dist |
Guntur |
Guntur |
2/25/2017 |
1034500 |
1034500 |
0 |
1034500 |
Completed |
643 |
2015-2016 |
Establishment of Vision Center Ponnavaram(V) Veerullapadu(M) |
VEERULLAPADU |
PONNAVARAM |
6/16/2017 |
777190 |
777190 |
0 |
777190 |
Completed |
644 |
2015-2016 |
Estblishment of Vision center Bantumilli(M) |
BANTUMILLI |
BANTUMILLI |
6/16/2017 |
777190 |
777190 |
0 |
777190 |
Completed |
645 |
2015-2016 |
Estblishment of Vision center Challapalli(M) |
CHALLAPALLI |
CHALLAPALLE |
6/16/2017 |
777190 |
777190 |
0 |
777190 |
Completed |
646 |
2015-2016 |
Estblishment of Vision center Ibrahimpatnam(M) |
IBRAHIMPATNAM |
IBRAHIMPATNAM |
6/16/2017 |
777190 |
777190 |
0 |
777190 |
Completed |
647 |
2015-2016 |
Estblishment of Vision center Kaikaluru(M) |
KAIKALURU |
KAIKALUR (U) |
6/16/2017 |
777190 |
777190 |
0 |
777190 |
Completed |
648 |
2015-2016 |
Estblishment of Vision center Vatsavai(M) |
VATSAVAI |
VATSAVAI |
6/16/2017 |
777190 |
777190 |
0 |
777190 |
Completed |
649 |
2015-2016 |
Estblishment of Vision center Jaggaiahpet(M) |
JAGGAIAHPET |
JAGGAYYAPETA (U) |
6/16/2017 |
771900 |
771900 |
0 |
0 |
Not Started |
650 |
2015-2016 |
Estblishment of Vision center Nandigama(M) |
NANDIGAMA |
NANDIGAMA |
6/16/2017 |
771900 |
771900 |
0 |
0 |
Not Started |
651 |
2015-2016 |
Establishement of Vision center Tiruvuru(M) |
NANDIGAMA |
NANDIGAMA |
6/15/2017 |
771900 |
771900 |
0 |
0 |
Not Started |
652 |
2015-2016 |
Establishement of Vision center Vijayawada Corp |
VIJAYAWADA CORP |
24TH DIVISION |
6/15/2017 |
771900 |
771900 |
0 |
0 |
Not Started |
653 |
2015-2016 |
Establishment of Vision Center Avanigadda(V)&(M) |
AVANIGADDA |
AVANIGADDA |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
654 |
2015-2016 |
Establishment of Vision Center Bapulapadu(V) & (M) |
BAPULAPADU |
BAPULAPADU |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
655 |
2015-2016 |
Establishment of Vision Center Chandarlapadu(V) &(M) |
CHANDARLAPADU |
CHANDARLAPADU |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
656 |
2015-2016 |
Establishment of Vision Center Chatrai (V) &(M) |
CHATRAI |
CHATRAI |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
657 |
2015-2016 |
Establishment of Vision Center G.konduru(V)&(M) |
G.KONDURU |
KONDURU |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
658 |
2015-2016 |
Establishment of Vision Center Gampalagudem(V)&(M) |
GAMPALAGUDEM |
GAMPALAGUDEM |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
659 |
2015-2016 |
Establishment of Vision Center Ghantasala(V)&(M) |
GHANTASALA |
GHANTASALA |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
660 |
2015-2016 |
Establishment of Vision Center Gudlavalleru(V) & (M) |
GUDLAVALLERU |
GUDLAVALLERU |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
661 |
2015-2016 |
Establishment of Vision Center Guduru(V) &(M) |
GUDUR |
GUDUR |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
662 |
2015-2016 |
Establishment of Vision Center Kalidindi(V) &(M) |
KALIDINDI |
KALIDINDI |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
663 |
2015-2016 |
Establishment of Vision Center Kanchikacherla(V) &(M) |
KANCHIKACHERLA |
KANCHIKACHERLA |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
664 |
2015-2016 |
Establishment of Vision Center Koduru(V) & (M) |
KODURU |
KODURU |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
665 |
2015-2016 |
Establishment of Vision Center Kruthivennu(V) &(M) |
KRUTHIVENNU |
KRUTHUVENNU |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
666 |
2015-2016 |
Establishment of Vision Center Mopidevi(V) &(M) |
MOPIDEVI |
MOPIDEVI |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
667 |
2015-2016 |
Establishment of Vision Center Musunuru (V) &(M) |
MUSUNURU |
MUSUNURU |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
668 |
2015-2016 |
Establishment of Vision Center Nagayalanka(V) &(M) |
NAGAYALANKA |
NAGAYALANKA |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
669 |
2015-2016 |
Establishment of Vision Center Nandivada(V) &(M) |
NANDIVADA |
NANDIVADA |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
670 |
2015-2016 |
Establishment of Vision Center Pamarru(V) &(M) |
PAMARRU |
PAMARRU |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
671 |
2015-2016 |
Establishment of Vision Center Pamidimukkala(V) &(M) |
PAMIDIMUKKALA |
PAMIDIMUKKALA |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
672 |
2015-2016 |
Establishment of Vision Center Pedaparupudi(V) &(M) |
PEDAPARUPUDI |
PEDAPARUPUDI |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
673 |
2015-2016 |
Establishment of Vision Center Venukuru(V) Penamaluru(M) |
PENAMALURU |
VANUKURU |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
674 |
2015-2016 |
Establishment of Vision Center Penuganchiprolu (V) &(M) |
PENUGANCHIPROLU |
PENUGANCHIPROLU |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
675 |
2015-2016 |
Establishment of Vision Center Reddigudem(V) &(M) |
REDDIGUDEM |
REDDIGUDEM |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
676 |
2015-2016 |
Establishment of Vision Center Gudivada(V) &(M) |
GUDIVADA |
GUDIVADA |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
677 |
2015-2016 |
Establishment of Vision Center Nuzvid (V) &(M) |
NUZVIDU MPL. |
18TH WARD |
10/12/2017 |
761528 |
761528 |
0 |
0 |
Not Started |
678 |
2015-2016 |
Estblishment Sanitary Napkin unit at Ponnavaram(V) Veerullpadu(M) |
VEERULLAPADU |
PONNAVARAM |
2/6/2018 |
294041 |
294041 |
0 |
0 |
Not Started |
679 |
2015-2016 |
Establishment of Sanitary Napkin unit in SC locality of Ponnavaram(V) in Veerullpadu(M) |
VEERULLAPADU |
PONNAVARAM |
2/6/2018 |
294041 |
294041 |
0 |
0 |
Not Started |
680 |
2015-2016 |
Construction of compoundwall to ZPH school Narth and west side in Kanumuru(V) Pamarru(M) |
PAMARRU |
KANUMURU |
2/6/2018 |
2000000 |
1500000 |
500000 |
1328549 |
Completed |
681 |
2015-2016 |
Construction of Primary Helth center Eruvapalem (V) Rajupalem(M) YSR Kadapa |
YSR Kadapa |
YSR Kadapa |
4/24/2018 |
500000 |
500000 |
0 |
500000 |
Completed |
682 |
2015-2016 |
Construction of Compund wall Primary Helth center Eruvapalem (V) Rajupalem(M) YSR Kadapa |
YSR Kadapa |
YSR Kadapa |
4/24/2018 |
500000 |
500000 |
0 |
500000 |
Completed |
683 |
2015-2016 |
To Provide additional Amemities to the community hall Oppicherla(V) Karmapudi(M) Guntur Dist |
Guntur |
Guntur |
4/21/2018 |
1000000 |
1000000 |
0 |
1000000 |
Completed |
684 |
2015-2016 |
Completion of Gram Panchayat Building, Atukuru (V), Unguturu (M), Krishna District |
UNGUTURU |
ATKURU |
4/18/2018 |
1350000 |
1350000 |
0 |
1000000 |
Completed |
685 |
2015-2016 |
Construction of IV floor for Divyangula Seva Kendram NGO (Jaipur Foot Centre) at Somasekharapuram (V) Nellore District |
Nellore |
Somasekharapuram |
10/24/2017 |
1000000 |
1000000 |
0 |
1000000 |
Completed |
686 |
2015-2016 |
Construction of GSB road from R&B road to K.Satyanarayana fields in Singarajupalem(V) of Nallajerla(M) in West Godawari District |
West Godavari |
Singarajupalem |
10/22/2017 |
1500000 |
600000 |
900000 |
590837 |
Completed |
687 |
2015-2016 |
To provide additional amenities the Community Hall in Madigapalle, Pavuluru(V) of Inkollu Mandal |
Prakasam |
Inkollu |
7/9/2018 |
800000 |
800000 |
0 |
800000 |
Completed |
688 |
2015-2016 |
Construct of Pipe Culverts at various places in Ambedkar Colony of Cherukur(V) of Parachur(M) in Prakasam District |
Prakasam |
Parchur |
10/16/2017 |
500000 |
500000 |
0 |
500000 |
Completed |
689 |
2015-2016 |
Construction of Pipe Culverts at various places in SC Colony of Cherukur(V) of Parchur(M) in Prakasam District |
Prakasam |
Parchur |
10/16/2017 |
500000 |
500000 |
0 |
500000 |
Completed |
690 |
2015-2016 |
RO plant with water bubbles 1000+ATW in Palaparru(V) of Pedanandipadu(M) of Guntur District |
Guntur |
Pedanandipadu |
5/8/2018 |
750000 |
750000 |
0 |
750000 |
Completed |
691 |
2015-2016 |
Construction of of shelter in 20x20x12 feet in Palaparru(V) of Pedanandipadu(M) of Guntur District |
Guntur |
Pedanandipadu |
5/8/2018 |
576000 |
576000 |
0 |
576000 |
Completed |
692 |
2015-2016 |
RO Plant with water bubbles 1000+ATW in SC Colony of Palaparru(V) of Pedanandipadu(M) of Guntur District |
Guntur |
Pedanandipadu |
5/8/2018 |
750000 |
750000 |
0 |
750000 |
Completed |
693 |
2015-2016 |
Construction of shelter in 20x20x12 feet in SC Colony of Palaparru(V) of Pedanandipadu(M) of Guntur District |
Guntur |
Pedanandipadu |
5/8/2018 |
576000 |
576000 |
0 |
576000 |
Completed |
694 |
2015-2016 |
Construction of Physics laboratory in Sri Gouri Sankar Junior College(aided) in Proddutur(V) and Mandal of YSR Kadapa District |
YSR Kadapa |
Proddutur |
1/6/2019 |
498000 |
498000 |
0 |
498000 |
Completed |
695 |
2015-2016 |
Construction of Chemistry laboratory in Sri Gouri Sankar Junior College(aided) in Proddutur(V) and Mandal of YSR Kadapa District |
YSR Kadapa |
Prodduturu |
1/6/2019 |
498000 |
498000 |
0 |
498000 |
Completed |